Abstract
Song-Do international city is the area developed in large-scale land reclamation. Song-Do area consists of reclamation layer, sedimentary layer(loose silt, soft clay and sand alternating) and residual layer from the ground surface. Therefore, using pile foundation is inevitable to build structures safely. In this area, driven PHC piles have been generally constructed in terms of environmental and economic conditions. As a result of analyzing 4 sites in Song-Do district 5 and 7 recently, the method of driving pile has many problems because of existence of rigid soil in sedimentary layer and installation of more than 30m piles. In this case, when installing piles by drive after pre-boring up to appropriate depth, the results of constructability analysis were very good. And in the economic efficiency, although 4% of construction cost rose, it was a very slight increase in comparison with improvement of workability. In the case of the stability, more than 70% compared to the allowable stress of piles was satisfied through the load test. As a result, when PHC piles is installed in Song-Do district, the proper construction method is that piles are located at bearing layer after boring rigid sand layer.
송도 국제화 복합단지는 대규모 간척사업을 통해 조성된 지역이며 준설매립층을 포함 느슨한 실트층과 연약한 점토층, 모래층 등이 교호하여 퇴적되어 있다. 따라서 본 지역에 구조물을 안전하게 설치하기 위해서는 말뚝기초의 사용이 불가피하다. 송도 국제화 복합단지 내 말뚝기초 적용현장의 경우, 환경적인 조건과 경제적인 측면에서 항타방식의 PHC 말뚝이 대부분 적용되었다. 최근 송도 국제화 복합단지 5~7공구 내 PHC 말뚝기초를 적용하여 시공된 4개 현장을 분석한 결과 퇴적층 내 경질층의 출현 및 30m 이상의 말뚝설치로 인해 항타방식의 시공은 어려움이 많은 것으로 나타났다. 이 경우 적절한 심도까지 선 천공 후 항타 관입을 시행하여 말뚝을 설치했을때 시공성 분석결과 매우 양호한 결과를 얻었다. 또한 경제성의 경우에도 약 4% 정도의 상승으로 시공성 향상에 비해 매우 미소한 증가임을 알 수 있었다. 안정성 측면에서는 재하시험을 통해 확인한 결과 말뚝재료의 허용응력 대비 약 70% 이상을 만족하는 것으로 확인되었다. 이상의 분석결과를 통해 볼 때 송도지역 내 PHC 말뚝 적용은 퇴적 환경을 고려하여 조밀한 모래층을 선 천공한 후 항타를 통해 양호한 지지층에 설치하는 방법이 가장 합리적인 것으로 판단되었다.