References
- Victor E. Sanvido, "Conceptual Construction Process Model", 1988
- Mohamed, A. N. "Knowledge based approach for productivity adjusted construction schedule", Expert systems with applications, Vol.21(2), pp. 87-97 ,2001 https://doi.org/10.1016/S0957-4174(01)00029-X
- Md. Salim, Leonhard E. Bernold, "Effects of Design-Integrated Process Planning on Productivity in rebar Placement", J. Constr. Eng. Manage., Vol.120(4), pp.720-738, 1994 https://doi.org/10.1061/(ASCE)0733-9364(1994)120:4(720)
- "Direct Labor Productivity Measurement - As Applied In Construction and Major Maintenance Projects", No. 22R-01, AACE International Recommended Practice, 2004
- Cho,K., Hong, T., Hyun,C., "Integrated schedule and cost model for repetitive construction process", J. Constr. Eng. Manage., Vol.26(2), pp.78-88, 2010 https://doi.org/10.1061/(ASCE)ME.1943-5479.0000009
- RS Means, Building Construction Cost Data, 2010
- Ministry of Land, Transport and Maritime Affairs of the Korean government, Development of estimating fair construction cost and building management system, 2010
- Keller Warrack, Statistics for management and economics, Thomson Learning, Inc., 2003
- Awad S. Hanna, Jeffrey S. Russell, Timothy W. Gotzion, Erik V. Nordheim, "Impact of Change Orders on Labor Efficiency for Mechanical Construction", J. Constr. Eng. Manage., Vol.125(3), pp.176-184, 1999 https://doi.org/10.1061/(ASCE)0733-9364(1999)125:3(176)
- David S. Cottrell, "Contractor Process Improvement for Enhancing Construction Productivity", J. Constr. Eng. Manage., Vol.132(2), pp.189-196, 2006 https://doi.org/10.1061/(ASCE)0733-9364(2006)132:2(189)
- Eric Allmon, Carl T. Haas, John D. Borcherding, and Paul M. Goodrum, "U.S. Construction Labor Productivity Trends, 1970-1998", J. Constr. Eng. Manage., Vol.126(2), pp.97-104, 2000 https://doi.org/10.1061/(ASCE)0733-9364(2000)126:2(97)
- Makarand Hastak, Sanjiv Gokhale, Kartik Goyani, Taehoon Hong, and Bhavin Safi, "Analysis of Techniques Leading to Radical Reduction in Project Cycle Time", J. Constr. Eng. Manage., Vol.134(12), pp.915-927, 2008 https://doi.org/10.1061/(ASCE)0733-9364(2008)134:12(915)
- Osama Moselhi, Ihab Assem, and Khaled El-Rayes, "Change Orders Impact on Labor Productivity", J. Constr. Eng. Manage., Vol.131(3), pp.354-359, 2005 https://doi.org/10.1061/(ASCE)0733-9364(2005)131:3(354)
- Paul M. Goodrum, Dong Zhai, and Mohammed F. Yasin, "Relationship between Changes in Material Technology and Construction Productivity", J. Constr. Eng. Manage., Vol.135(4), pp.278-287, 2009 https://doi.org/10.1061/(ASCE)0733-9364(2009)135:4(278)
Cited by
- A model-based productivity improvement of reinforced concrete work in a multi-housing project vol.19, pp.5, 2015, https://doi.org/10.1007/s12205-015-0302-7