DOI QR코드

DOI QR Code

ICT Implementation for Materials Management in Construction Projects: Case Studies

  • Kasim, Narimah (Faculty of Technology Management, Business & Entrepreneurship, Universiti Tun Hussein Onn Malaysia)
  • 발행 : 2011.05.27

초록

Construction materials usually constitute a major portion of the total cost in a building construction project. Materials management Is made problematic by materials shortages, delays in supply, price fluctuations, damage and wastage, and lack of storage space. Despite the potential benefit of ICT, convincing construction organisations to embrace its use and implementation has proved a difficult task. This study seeks to identify the implementation of ICT for materials management processes in construction projects. The findings from the case studies reveal that the implementation of ICT in the materials management processes for construction projects in Malaysia Is at early stage. Microsoft Excel Spreadsheet and handheld devices are found to be the common ICT tools adopted in the materials management processes. The main barrier is found to be the cost involvement at the initial stage or overall implementation of ICT in the materials management processes. Finally, this paper concludes the finding from interviews towards the ICT implementation of materials management in the construction projects.

키워드

참고문헌

  1. L. C. Bell and G. Stukhart, "Attributes of materials management systems", Journal of Construction Engineering Construction Engineering and Management, vol. 112(1), pp. 14-22, 1986. https://doi.org/10.1061/(ASCE)0733-9364(1986)112:1(14)
  2. P. K. Dey, "Re-engineering materials management: A case study on an Indian refinery", Business Process Management Journal, vol. 7(5), pp. 394-408, 2001. https://doi.org/10.1108/EUM0000000006002
  3. J. R. Arnold and S. N. Chapman, "Introduction to Materials Management 5th Ed.", New Jersey: Prentice-Hall, 2004.
  4. F. Harris and R. MacCaffer, "Modern Construction Management" London: Blackwell Science, 2001.
  5. New Strait Times "Leverage on ICT in Construction Industry" 13 May, Malaysia, 2007.
  6. M. Sarshar and U. Isikdag, "A survey of ICT use in the Turkish construction industry", Journal of Engineering, Construction and Architectural Management, 11(4), pp. 238-247, 2004. https://doi.org/10.1108/09699980410547595
  7. J. Illingworth and K. Thain, "Material Management is it Worth It?", Technical Information Service, The Chartered Institute of Building ASCOT, 1998.
  8. H. Abdul-Rahman and M. N. Alidrisyi, "A Perspective of Material Management Practices in a Fast Developing Economy: the case of Malaysia", Construction Management and Economics, vol. 12, pp. 412-422, 1994.
  9. E. T. T. Wong and G. Norman, "Economic evaluation of materials planning systems for construction", Construction Management and Economics, vol. 15, pp. 39-47, 1997. https://doi.org/10.1080/014461997373097
  10. D. M. Lambert, J. R. Stock, and L. M. Ellram, "Fundamentals of Logistics Mangagement" United States: McGraw Hill, 1998.
  11. O.S. Ademeso and A. O. Windapo, "Relationship between Material Management Approach and Scheduled Project Completion Time", Construction and Building Research of the Royal Institution of Chartered Surveyors Conference, COBRA, Dublin Institute of Technology, 2008.
  12. L. S. Pheng and C. J. Chuan, "Just-in-time management in precast concrete construction: a survey of the readiness of main contractors in Singapore", Integrated Manufacturing Systems. vol.12, pp.416-429, 2001. https://doi.org/10.1108/EUM0000000006107
  13. K. Varghese, and J. T. O' Connor, "Routing large vehicles on industrial construction sites", Journal of Construction Engineering and Management, vol. 121 (1), pp. 1-12, 1995. https://doi.org/10.1061/(ASCE)0733-9364(1995)121:1(1)
  14. F.T.S. Chan, "Design of Materials handling Equipment Selection System: An Integration of Expert System with Analytic Hierarchy Process Approach", Integrated Manufacturing Systems, vol. 13(1), pp. 58-68, 2002. https://doi.org/10.1108/09576060210411512
  15. V. Prabu and M. Baker, "Materials Management" UK: McGraw-Hill, 1986.
  16. M. M. M. Teo and M. Loosemore, "A theory of waste behaviour in the construction industry", Journal of Construction Management and Economics, vol. 19(7), pp. 741-751, 2001. https://doi.org/10.1080/01446190110067037
  17. C. T. Formoso, L. S. M. ASCE, C. De Cesare, and E. L. Isatto, "Materials waste in building industry: Main causes and prevention", Journal of Construction Engineering and Management, vol. 128(4), pp. 316-325, 2002. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:4(316)
  18. A. K. Datta, "Materials Management: Procedures, text and cases, Rev. Ed.", New Delhi: Prentice-Hall, 1992.
  19. R. Navon and O. Berkovich, "An automated model for materials management and control", Journal of Construction Management and Economics, vol. 24(6), pp. 635-646, 2005. https://doi.org/10.1080/01446190500435671
  20. N. B. Kasim, C. J. Anumba, and A. R. J. Dainty, "Improving materials management practices on fast-track construction projects", 21st Annual ARCOM Conference, 7-9 September 2005, SOAS, University of London, vol. 2, pp. 793-802, 2005.
  21. M. Zakeri, P. Olomolaiye, G. D. Holt, and F. C. Harris, "A Survey of constraints on Iranian construction operatives' productivity" Journal of Construction Management and Economics, vol. 14, pp. 417-426, 1996. https://doi.org/10.1080/014461996373287
  22. E. J. Jaselskis, M. R. Anderson, C. T. Jahren, Y. Rorriguez, and S. Njos, "Radio-Frequency Identification Applications in Construction Industry." Journal of Construction Engineering and Management, vol. 121 (2), pp. 189-196, 1995. https://doi.org/10.1061/(ASCE)0733-9364(1995)121:2(189)
  23. T. Andel, "Automatic Data Identification: For your own good", Transportation and Distribution, vol. 34(10), pp. 76-88, 1993.
  24. V. Ahuja, J. Yang, and R. Shankar, "Study of ICT adoption for building project management in Indian Construction Industry", Automation in Construction, pp. 1-9, 2008.
  25. P. Ang and N. B. Kasim, "Implementation of ICT in Materials Management in Construction Projects", Degree Thesis, University Tun Hussein Onn Malaysia, January 2009
  26. R. K. Yin, "Case Study Research Design and Methods, Third Editions", Sage Publication, United Kingdom, 2003.

피인용 문헌

  1. Comparative Study of GPS-Integrated Concrete Supply Management using Discrete Event Simulation vol.4, pp.2, 2014, https://doi.org/10.6106/JCEPM.2014.4.2.031