DOI QR코드

DOI QR Code

A Study on Cost Risk Estimation applying Joint Cost-Schedule Probability Distribution Model

비용과 일정의 결합확률 분포를 적용한 위험비용추정에 관한 연구

  • Received : 2011.06.09
  • Accepted : 2011.09.16
  • Published : 2011.10.05

Abstract

The risk analysis plays an important role in weapon system acquisition project due to uncertainties in the acquisition process. But in domestic, studies on risk analysis are insufficient and risk cost is not included in acquisition budget in policy. Therefore, in this study, we suggest a method that measures risk or success probability of project using the stochastic model. In particular, in order to calculate the success probability, we apply the joint probability distribution model of cost and schedule that are critical factors influencing the project risk. And also we verify the applicability of this model in Korean defence industry environment through case studies.

Keywords

References

  1. 국방전력발전업무규정(국방부 훈령 제1306호), 국방부, 2011. 2. 8.
  2. 강성진, "무기체계 비용추정 위험분석 방안", 2009 안보연구시리즈 제10집 5호, 2009. 12.
  3. Book, Stephen A., "Cost Risk as a Discriminator in Trade Studies", Joint SCEA/ISPA International Conference New Orleans, LA, June, 2007.
  4. Dregner, J. A. at. el, "An Analysis of Weapon System Cost Growth", RAND, 1993.
  5. Smoker, R. and Smith, S., "Approach to Use of Selected Acquisition Reports for Measurement of TRLs and Associated System Cost Growth", 2008.
  6. 강성진, "비용추정론", 두남, 2010.
  7. Stephen A. Book, "Quantifying the Relationship between Schedule and Cost", 2009 NASA Cost Symposium, 2009.
  8. Garvey, P. R. and Taub, A. E., "A Joint Probability Model for Cost and Schedule Uncertainties", The Journal of Cost Analysis, Spring 1997.
  9. 윤병창, 배현웅, "통계학 이론", 북스힐, 2005.
  10. 산업연구원, 국방대학교, "한국형 공격헬기 사업 분석평가", 방위사업청, 2010.
  11. 국방대학교, "비용분석 전산모델의 정확도 향상방안 연구", 방위사업청, 2009.