Abstract
BIM(Building Information Modeling) technologies should be applied for the construction life cycle to maximize its efficiency, but the utilization for the construction phase has been significantly lower than that for the planning and design phase. Recently, some of BIM techniques such as 3D design review, 4D schedule management and so on are being introduced for efficient managing to the big national construction projects. In this study, the utilization plans of BIM are presented for the construction phase of civil engineering facilities. The methods of utilization of BIM are discussed for each type of construction, and the techniques applied to the Seoul Subway Lot No. 919 are analyzed for checking the applicability and usability. In particular, a web construction management system based on BIM can help field engineers, headquarters and contractors to use BIM more effectively, and it can be extended to maintenance phase for more efficiencies.
BIM(Building Information Modeling)은 원칙적으로 건설 전 생애주기에 걸쳐 활용되어야 그 효과를 극대화 할 수 있으나, 아직은 계획 및 설계단계에 비하여 공사단계에서는 그 활용도가 상당히 낮은 수준이었다. 최근 대형 국책사업이 발주, 시공되면서 효율적인 공사관리를 위한 방법으로 3D 성과품 검토나 4D 공정관리 등 BIM기법 중 일부가 도입되고 있다. 본 연구에서는 토목시설물의 공사단계에서 BIM 활용방안에 대하여 제시하였다. 토목공사의 종류별, 관리 분야별 BIM 활용방안에 대하여 논의하고, 서울 지하철 919공구에 실제로 적용하여 그 효용성에 대하여 분석하였다. 특히, 현장에 구축된 BIM 기반의 웹 공사관리 시스템은 공사중, 현장과 본사를 비롯해 발주처와 감리단 등 다수의 공사 주체들이 BIM을 보다 효과적으로 사용하도록 함으로써, BIM의 공사단계 활용성을 높일 뿐만 아니라 유지관리 단계까지 확장하여 이용될 수 있다.