Abstract
The communication of each others is lack between planing, design, construction and maintenance in domestic construction industry. This problem makes the omission of information and the loss of cost. So, the introduction of BIM can be the solution about that. BIM manages all information generated during all life-cycle of a structure and consequently maximizes the efficiency of utilizing information. This is done through 3D information model associated with a three-dimensional(3D) parametric CAD. This study proposes the seismic analysis process of steel box bridge for structural design of bridge construction project based on BIM. The additional process is needed for the purpose that structural data is inherent in the property information of 3D information model. This process has 3D modeling progress done by using the information decided in design phase. The design document of seismic analysis can be derived with the proposed process to steel box bridge.
국내 토목분야의 건설산업에서는 비효율적인 의사소통으로 인하여 발생하는 업무전환 단계에서의 정보누락 및 그로 인한 비용손실 등의 문제점을 해소시키기 위한 획기적인 해결책으로 BIM의 도입이 대두되고 있다. BIM은 구조물의 생애주기 전 단계에서 발생되는 모든 정보들을 3차원 파라메트릭 CAD와 연계된 3차원 정보모델을 통하여 관리하여 정보활용의 효율성을 극대화시킨다. 본 논문에서는 BIM기반의 교량건설 프로젝트의 구조설계 업무에서 사용할 목적으로 강상자형 교량의 3차원 정보모델을 활용한 내진해석 프로세스를 제안하였다. 또한 3차원 정보모델의 속성정보들이 구조적 데이터를 내재할 수 있도록 하기 위하여 3차원 모델링작업이 구조설계 업무를 통하여 결정되는 정보들을 활용하여 이루어질 수 있도록 하는 프로세스를 제안하였다. 제시된 프로세스는 현재 건설이 진행 중인 강상자형 교량을 적용하여 구성하였다. 또한 프로세스를 적용하여 내진해석의 최종 산출물인 내진계산서의 도출이 가능하다.