Design of Test Configuration and Analysis of Electrical Integration Result between GEO Satellite Solar Array and Bus

정지궤도위성용 태양전지판 전기적 접속시험 형상 설계 및 시험 결과 분석

  • 김영윤 (한국항공우주연구원 위성기능시험팀) ;
  • 권재욱 (한국항공우주연구원 위성기능시험팀) ;
  • 윤영수 (한국항공우주연구원 위성기능시험팀) ;
  • 최종연 (한국항공우주연구원 위성기능시험팀)
  • Received : 2010.01.11
  • Accepted : 2010.10.01
  • Published : 2010.11.01

Abstract

KARI had integrated and tested GEO satellite in cooperation with Astrium Inc., France. In the middle of integration and test, It was necessary to check GEO satellite SA(solar array) status and require electrical interface verification with bus. SA of GEO satellite have different mechanical characteristics in comparison with those of LEO satellite which was tested in KARI. LEO SA has been deployed by simple mechanical hinge system but GEO SA has been done by more complicated method. so in this paper, we designed the test configuration and analyzed the test result of solar array electrical integration of GEO satellite.

한국항공우주연구원에서는 정지궤도위성의 조립 및 시험을 프랑스 아스트리움(Astrium)사와 공동 수행하고 있다. 시험의 일환으로 태양전지판의 상태와 버스에 접속하여 전개 및 그 접속검증 시험을 수행하였다. 저궤도 위성의 경우 기계적 힌지구조로 전체 전개가 이루어지고 전기적 접속 또한 태양 전지판이 생산하는 전력, 태양센서의 신호 등이 전달되는 단순한 구조이나, 정지 궤도 태양전지판의 경우 기계적인 힌지와 전기적인 모터를 통하여 전체 전개가 이루어짐으로서 구동에 필요한 신호 등의 전기적접속이 다양하다. 이에 이를 구동하는 전기적 접속 및 파이로 신호전달 접속을 검증하기 위한 시험형상을 설계하고, 이 시험을 위한 지상지원장비의 구성 및 검증 결과의 특성을 분석하였다.

Keywords

References

  1. 김영윤, 최종연, 조승원, 윤영수, 권재욱, 허윤구, "정지궤도위성 버스와 태양전지판 접속시험 검증형상 설계 및 분석," KARI-SFT-TM-2009-004, 2009
  2. COMS Solar Array Design Description, CO MS-ASO-DS-3000-0001
  3. COMS Wing Data Report , COMS-ASO-TR-3000-0003
  4. (+)Y MGU Solar Array Deployment -6hDP (without pyrotechnic release), COMS.PR.0001 1.TL.K.ASTR
  5. +Y Solar Array Electrical Integration, COMS.PR.00078.TL.K.ASTRer 2006
  6. Solar Array +Y connection validation, COMS.PR.0094.TL.K.ASTR
  7. SA Wing Coupling to S/C and Uncoupling f rom S/C, COMS.PR.00286.DP.T.ASTR
  8. COMS SOLAR ARRAY, EQSR (Equipment Qualification Ststus Review)