Application of Fuzzy Linear Programming to Estimate the Potentiality of Domestic Long-Term Wood Supply

국내 장기목재공급 잠재력 예측을 위한 퍼지선형계획법의 적용

  • Won, Hyun-Kyu (Division of Forest Management, Korean Forest Research Institute) ;
  • Kim, Young-Hwan (Division of Forest Management, Korean Forest Research Institute) ;
  • Lee, Kyeong-Hak (Division of Forest Management, Korean Forest Research Institute) ;
  • Jang, Kwang-Min (Division of Forest Management, Korean Forest Research Institute)
  • 원현규 (국립산림과학원 탄소경영연구과) ;
  • 김영환 (국립산림과학원 탄소경영연구과) ;
  • 이경학 (국립산림과학원 탄소경영연구과) ;
  • 장광민 (국립산림과학원 탄소경영연구과)
  • Received : 2010.07.08
  • Accepted : 2010.09.30
  • Published : 2010.12.30

Abstract

The objective of this study was to estimate potential of domestic long-term wood supply by using fuzzy linear programming (FLP). In order to construct a numerical formula model, maximization of total timber production was used for the objective function. Size limit of harvesting and sustained yield were used as the constraints. The results of comparison between LP and FLP were shown that LP is more suitable than FLP in terms of the amount of timber production and final forest stock. However, as long-term sustained yield was limitedly achieved by using LP, FLP was more desirable for prediction of potential wood supply. According to the results of this study, the potential of annual domestic wood supply was estimated about 10.5 million cubic meters. Gyeong buk, Jeon nam, Gangwon and Gyeong nam province were highly ranked in order of provincial potential of wood supply.

본 연구에서는 퍼지선형계획법을 적용함으로써 국내의 장기목재공급 잠재력을 예측하고자 하였다. 생산계획 수립을 위한 수식모형을 구성하기 위하여 총 목재생산량의 극대를 목적함수로 설정하였으며, 제약조건으로는 벌채허용면적, 보속수확 등을 고려하였다. 선형계획법과 퍼지선형계획법의 비교 결과 목재생산량 및 입목축척의 관점에서 선형계획법이 퍼지 선형계획법 보다 높게 나타났다. 그러나, 선형계획법에서는 장기적인 관점에서 보속수확을 달성하지 못하는 것으로 나타나 보속성을 고려한 목재공급 잠재력을 예측하기 위해서는 퍼지선형계획법을 적용하는 것이 적합한 것으로 판단되었다. 연구결과 국내 연간 목재공급 잠재량은 약 10.5백만$m^3$으로 추정되었다. 각 지역별 연간 목재공급 잠재량은 경상북도가 가장 많고, 전라남도, 강원도, 그리고 경상남도 순으로 많게 나타났다.

Keywords

References

  1. 국립산림과학원. 2010. 국내 목재생산 잠재력 예측. 국 립산림과학원 연구보고. pp. 77-95.
  2. 산림청. 2007. 경제림육성단지 관리계획 수립지침. 19p.
  3. 산림청. 2008. 제5차 산림기본계획 2008-2017. pp. 8-13.
  4. 산림청. 2009a. 임업통계연보. pp. 30-31.
  5. 산림청. 2009b. 재적.중량표 및 임분수확표. 271pp.
  6. 손영모, 이경학, 김래현. 2007. 우리나라 산림 바이오매스 추정. 한국임학회지 96(4): 477-482.
  7. 원현규, 우종춘. 1996. 불확실성하의 선형계획법에 의한 목재수확계획. 산림경제연구 4(1): 73-91.
  8. 이준표, 황견란, 박순철. 2008. 국내 바이오매스 자원 잠 재량 산정방법. 한국태양에너지학회 추계학술발표회 논 문집. pp. 332-337.
  9. 정충영. 1997. 자동차부품 하청업체에서의 '퍼지'생산계획 모형. 한국중소기업학회지 19(2): 69-88.
  10. B.C. Ministry of Forests. 1999. Timber supply review : Cranbrook Timber Supply Area Analysis Report. pp. 9-10.
  11. Coutu, A.J. and Ellertsen, B.W. 1960, Farm forestry planning through linear programming. Tennessee Valley Authority Technical Report 236-60.
  12. Hetsch, S. 2008. Potential sustainable wood supply in Europe. UNECE/FAO Timber Section. pp. 20-21.
  13. Johnson, K.N. and Scheuman, H.L. 1977. Technique for prescribing optimal timber harvest: a site-specific spatial model in forest planning calculations. Landscape Ecology 22: 243-256.
  14. Kao, C. and Bodie, J.D. 1979. Goal programming for reconciling economic, even-flow, and regulation objectives in forest harvest scheduling. Canadian Journal of Forest Research 9: 525-531. https://doi.org/10.1139/x79-087
  15. Masera., O., Ghilardi, A., Drigo, R. and Trossero, M.A. 20067. WISDOM: A GIS-based supply demand mapping tool for woodfuel management. https://doi.org/10.1016/j.biombioe.2006.01.006
  16. Thompson, E.F. 1968. The theory of decision under uncertainty and possible applications in forest management. Forest Science 14(2): 156-163.
  17. Thompson, E.F. and Haynes, R.W. 1971. A linear programming- probabilistic approach to decision-making under uncertainty. Forest Science 17: 224-229.
  18. Mendoza, G.A., Bare, B.B. and Zhou, Z. 1993. A fuzzy multiple objective linear programming approach to forest planning under uncertainty. Agricultural Systems 41: 257-274. https://doi.org/10.1016/0308-521X(93)90003-K
  19. Zimmermann, H.J. 1978. Fuzzy programming and linear programming with several objective functions. Fuzzy Sets and System 1: 45-55.https://mail.snu.ac.kr/downloadAttach. do?folder=Inbox&uid=2096&part=1:1 https://doi.org/10.1016/0165-0114(78)90031-3