References
- A. J. Shenher, “Improving PM: Linking Success Criteria to Project Type,” Project Management Institude, Creating Canadian Advantage through Project Management Symposium, Calgory, 1996.
- L. H. Putnam and W. Myers, "Familiar Metric Management-Time-to-Market, http://www.qsm.com/fmm_08.pdf
- L. H. Putnam and W. Myers, “Five Core Metrics: The Intelligence Behind Successful Software Management,” Dorset House Publishing, 2003.
- L. H. Putnam and W. Myers, “Measures of Excellence: Reliable Software on Time, Within Budget,” Yourdon Press, 1992.
- L. H. Putnam and W. Myers, “What We Have Learned,” The Journal of Defense Software Engineering, 2000.
- L. H. Putnam and W. Myers, “Familier Metric Management+,” http://www.qsm.com/ffmm_02.pdf
- J. E. Matson, B. E. Barrett and J. M. Mellichamp, “Software Development Cost Estimation Using Function Points,” IEEE Trans. on Software Eng., Vol.20, No.4, pp.275-287, 1994. https://doi.org/10.1109/32.277575
- C. Jones, “Programming Productivity,” New York, McGraw-Hill, 1986.
- G. C. Low and D. R. Jeffery, “Function Points in the Estimation and Evaluation of the Software Process,” IEEE Trans. on Software Eng., Vol.16, pp.64-71, 1990. https://doi.org/10.1109/32.44364
- R. D. Emrick, “In Search of a Better Metric for Measuring Productivity of Application Development,” Int. Function Point Users Group Conf. Proc., 1987.
- B. W. Boehm, “Software Engineering Economics,” Prentice Hall, 1981.
- M. Bradley, “Function Point Counting Practices Manual, Release 4.1,” International Function Point Users Group (IFPUG), 1999.
- C. Symons, “COSMIC-FFP Measurement Manual, Version 2.2 (The COSMIC Implementation Guide for ISO/IEC 19761: 2003),” Common Software Measurement International Consortium, 2003.
- ISO/IEC FDIS 19761, “Software Engineering - COSMIC - FFP - A Functional Size Measurement Method,” 2002.
- B. W. Boehm et al, “Software Cost Estimation with COCOMO II,” Prentice-Hall, 2000.
- K. Ribu, “Estimating Object-oriented Software Projects with Use Cases,” University of Oslo Department of Informatics, Master of Science Thesis, 2001.
- F. P. Brooks, “The Mythical Man-Month: Essays on Software Engineering,” Addison-Wesley, 1995.
- J. Nyman, “Metrics and Measures,” GlobalTester, TechQA, 2002.
- QSM, “Index Based Productivity Benchmarking,” QSM Associates, Inc. 1999.
- T. McGilbon, “Modern Empirical Cost & Schedule Estimation Tools,” DoD DACS Technical Reports, 1997.
- D, L, Hallowell, “Software Project Management Meets Six Sigma,” http://software.isixsigma.com/library/content/c030813a.asp
- ISBSG, “Worldwide Software Development - The Benchmark Release 8,” Victoria, Australia International Software Benchmarking Standards Group, 2004.
- S. J. Garg, “Software Engineering: Project Management Concepts, Software Metrics,” http://www.indyan.com/CS10.html 2003.
- QSM, “QSM Function Point Programming Languages Table,” Quantitative Software Management, Inc., 2002.
- D. Herron, “Software Sizing: There is an Easier Way,” David Consulting Group, ASM, 2002.
- C. Jones, “Applied Software Measurements,” McGraw Hill, 1996.
- T. McGilbon, “Modern Empirical Cost & Schedule Estimation Tools,” DoD DACS Technical Reports, 1997.
- G. Sifri, “Accurate Estimates Critical for Software Development Projects,” ESI International, Inc., 2001
- W. G. Cochran, “Sampling Techniques,” 3rd Edition, John Wiley & Sons, 1977.
- D. R. Jones, “Project Scheduling,” Augsburg College, 1999.
- C. Carbno, “Optimal Resource Allocation for Projects,” Project Management Journal, 1999.
- Y. Yang, Z. Chen, R. Valerd, and B. Boehm, “Effect of Schedule Compression on Project Effort,” 27th Annual Conference of the International Society of Parametric Analysis, Denver, Colorado, USA., 2005.
- C. Fakharzadeh, “CORADMO in 2001: A RAD Odyssey,” 16th International Forum on COCOMO and Software Cost Modeling, USC-CSE, 2001.
- B. Boehm, B. Clark, E. Horowitz, R. Modachy, R. Shelby, and C. Westland, “The COCOMO 2.0 Software Cost Estimation Model,” USC Center for Software Engineering, 1995.
- J. A. Ward, “Productivity Through Project Management: Controlling the Project Variables,” Information Management, 1994. https://doi.org/10.1080/10580539408964615
- R. Pressman, C. Jones, V. Basilli, and L. Putnam, “16 Critical Software Practices, Estimate Cost and Schedule Empirically,” http://www.iceinusa.com/16CSP/content/2-cost/anmetrgt.html, 2005.
- L. K. Richard, “Staff IT,” http://www.gantthead.com, 2005.
- M. Holtsinger, “CIS 4251/CIS 5930 Software Development,” 1999.
- C. Abts, A. W. Brown, S. Chulani, B. K. Clark, E. Horowitz, R. Madachy, D. Reifer, and B. Steece, “Software Cost Estimation with COCOMO II,” Prentice-Hall, 2000.
- Marin Consultancy, “Estimation,” Marin Solutions Technical Paper, 2001.
- C. Walston and C. Felix, “A Method of Programming Measurement and Estimation,” IBM Systems Journal, Vol. 16, No.1, 1977. https://doi.org/10.1147/sj.161.0054
- K. Johnson, “Software Cost Estimation: Metrics and Models,” Department of Computer Science, University of Calgary. 1998.