Abstract
Learning rate is generally applied to estimate an appropriate production labor cost. Learning effect is obtained from repetitive work during the production period under 3 assumptions ; homogeneous production, same producer, quantity measure in continuous unit. However, production breaks occur frequently in Korean defense industry environment because of budget constraint and annual requirements. In this case previous learning effect can not be applied due to learning loss. This paper proposed the application of learning rate when a production break occurs in Korea defense industry. To obtain a learning loss, we surveyed various learning loss factors for different production breaks(6, 12, 18 months) from 4 defense industry companies. Then, we estimate the first unit labor hours in re-production phase after production break using Anderlohr method and Retrograde method with the result of the survey. This work is the first attempt to show a method which defines and evaluates the learning loss factors in Korean defense industry environment.