Innovative Contracting Techniques for Highway Construction Projects: Incentive/Disincentive Provisions

  • Pyeon, Jae-Ho (Civil and Environmental Engineering San Jose State University)
  • 발행 : 2010.08.01

초록

키워드

참고문헌

  1. American Association of State Highway and Transportation Officials.(AASHTO). (2006). "Primer on Contract Administration Section of the AASHTO Subcommittee on Construction, Fifth Edition, Washington, D.C.
  2. Anderson, S. and Damnjanovic, I. (2008). "Selection and Evaluation of Alternative Contracting Methods to Accelerate Project Completion." National Cooperative Highway Research Program (NCHRP), NCHRP synthesis 379, Transportation Research Board, National Research Council, Washington, D.C.
  3. Arditi, D., and Yasamis, F. (1998). Incentive/Disincentive Contracts: Perceptions of Owners and Contractors. Journal of Construction Engineering and Management, 124(5), 361-373. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:5(361)
  4. Christiansen, D. L.(1987). "An Analysis of the Use of Incentive/Disincentive Contracting Provisions for Early projet Completion." Transportation Management for Major Highway Research Board, Washington, D.C.
  5. Ellis, R, Pyeon, J., Herbsman, Z., Minchin, E., & Molenaar, K. (2007). "Evaluation of Alternative Contracting Techniques on FDOT Construction Projects." Final Report, Florida Department of Transportation, Tallahassee, Florida.
  6. Federal Highway Administration (FHWA). (1989). "Incentive/Disincentive for Early Contract Completion, D.C. (June 28,2010).
  7. Federal Highway Administration (FHWA). (2008). "Contract Administration Core Curriculum Participant's Manual and Reference Guide." Office of Infrastructure and Office of Program Administration, Contract Administration Group, FHWA, Washington, D.C. (June 28, 2010).
  8. Gillespie, J. (1997). Estimating User Costs as a Basis for Incentive/Disincentive Amounts in Highway Construction Contracts. Final Report, Virginia Transportation Research Council, Charlottesville, The Federal Highway Administration, Washington, D.C.
  9. Herbsman, Z, Chen, W., and Epstein, W. (1995). Time is Money: Innovative Contracting Methods in Highway Construction. Journal of Construction Engineering and Management, 121(3), 273-281. https://doi.org/10.1061/(ASCE)0733-9364(1995)121:3(273)
  10. Jaraiedi, M., Plummer, R., and Aber, S. (1995). Incentive/Disincentive Guidelines for Highway Construction Contracts, Journal of Construction Engineering and Management, ASCE.
  11. Minnesota Department of Transportation (MnDOT). (2005). "Innovative Contracting in Minnesota 2000 to 2005." Office of Construction and Innovative Contracting. MnDOT, Minnesota.
  12. PinnacleOne. (2004). "Summary Level Study of A+B Bidding Evaluation Final Report, Office of Engineering Management, California Department of Transportation. Sacramento, California.