Shielding Design of Electron Beam Accelerators Using Supercomputer

슈퍼컴을 이용한 전자빔가속기의 차폐설계

  • Received : 2010.02.09
  • Accepted : 2010.02.18
  • Published : 2010.03.30

Abstract

The MCNP5 neutron, electron, photon Monte Carlo transport program was installed on the KISTI's SUN Tachyon computer using the parallel programming. Electron beam accelerators were modeled and shielding calculations were performed in order to investigate the reduction of computation time in the supercomputer environment. It was observed that a speedup of 40 to 80 of computation time can be obtained using 64 CPUs compared to an IBM PC.

Keywords