Productivity Improvement Plan Using Motion Analysis and Facility Relocation : Case Study

동작분석과 설비 재배치를 통한 생산성 향상 방안 : 사례연구

  • Kim, Dong-Hyun (Department of Industrial Engineering, Hanyang University) ;
  • Park, Dong-Bin (Department of Systems Management Engineering, Inje University) ;
  • Kwon, Ick-Hyun (Department of Systems Management Engineering, Inje University)
  • 김동현 (한양대학교 산업공학과) ;
  • 박동빈 (인제대학교 시스템경영공학과) ;
  • 권익현 (인제대학교 시스템경영공학과)
  • Received : 2010.01.20
  • Accepted : 2010.03.12
  • Published : 2010.03.31

Abstract

Today's fierce competition and global economic recession make most of manufacturing companies in the world difficult to gain a profit. In order to survive such a environment and increase competitiveness, manufacturing companies have to continuously eliminate their wasteful factors through an efficient process analysis, improve quality of products, increase the flexibility of manufacturing processes. In this paper, we consider a case study for the Shanghai New Auto which is a subcontractor of MOBIS in China, to improve productivity by using therblig method, one of the motion analysis, to minimize the work-in-process inventories and to shorten the manufacturing cycle times. We also try to relocate the facility layout to increase the efficiency and flexibility of manufacturing processes.

Keywords

References

  1. 김태수, 현대작업관리, 북스힐 (2004).
  2. 송명식, 유왕진, 이철규, "고성과 생산관리시스템을 통한 제조기업의 생산성 재고", 한국생산관리학회지, 17권, 1호 (2006) : pp. 93-116.
  3. 유창권, "화주기업과 물류서비스 공급업체의 파트너쉽 유형과 물류서비스 만족도에 관한 실증적 연구 : 중국 전출 한국 제조업체를 중심으로", 무역학회지, 33권, 4호 (2008) : pp. 103-118.
  4. 정병용, 이동경, 현대인간공학, 민영사 (2009).
  5. 최정화, 권혜진, 우재영, 박범, "제조공정에서의 표준시간 몇 라인밸런싱 적용사례", 대한설비관리학회지, 3권, 2호 (1998) : pp. 161-173.
  6. 황학, 작업관리론, 영지문화사 (2000).
  7. Chopra, S. and Meindl, P., Supply Chain Management: Strategy, Planning, and Operation, Prentice-Hall (2006).
  8. Santosm, J., Wysk, R.A. and Torres, J.M., Improving Production with Lean Thinking, John Wiley & Sons (2006).