초록
This paper aims to develop a revitalized strategy for Daecheongdong district located on surrounding area of Daecheong dam, which general development projects are restricted by the acts of Green-belt area and Water supply protection zone. The study area consists of 13 villages in Donggu, Daejeon city. This study performed not only survey of amenity and human resources in the whole study area, but also development of new strategy integrating $1^{st}$, $2^{nd}$, and $3^{rd}$ industries for agriculture with potential. In the sample survey to 11% of village people, the new strategy was accepted positively with 88% of Understanding and 65% of Agreement in answer. The composition plans of farming association and total brand in the study area were agreed by 30% of residents with strong opinion. Representative groups of people living in Donggu, outside of the study area, have also positive opinion of 86% for Purchasing of agricultural products, 89% of Experience tourism, and 61% of Corporation for the study area, which the answering rate was 11% among 326 people. Finally, this study also investigated the corresponding Acts on performing of the new projects extracted in this study.