초록
It seems that a primary concern of the project-based company, which provides a large scale product or service over long term period, is to run a successful project through systematic project process control and control costs. One of the typical project control methods is Earned Value Management System(EVMS) which analyses the precess through performance measurement. Even though the EVMS is a highly efficient tool in the managerial aspect, it cannot easily determine the Planned Value(PV), Actual Cost(AC), or Earned Value(EV) due to the indistinct criteria and extensive data. The accurate calculation of AC in particular, is the basic of project management, but most companies record direct personnel expenses or direct expenses only. Since they calculate indirect expenses based on the estimated ratio, it limits the systematic project management that reflects changes in profit and loss of a company. This study introduces a EVMS for project management and its actual case based on EVMS and ERP system which some additional modules are installed for performance measurement. It is expected that this new method enables a company to save time and effort, and also to improve transparency by specifying expense items in detail and to switch quarterly settlement to monthly by reducing the time of calculation.