Abstract
In this study, a case study was introduced for the design of a twin tunnel along high speed national highway Route 12 from Damyang to Sungsan. It was related to determine the optimal tunnel support pattern and excavation method based on a risk analysis in order to incorporate the uncertainty of ground properties. To this end, three alternatives with different amounts of support and excavation method were selected and risk analysis was performed by applying Monte Carlo simulation technique, respectively. Stability of the tunnel was quantified by the factor of safety. To improve the result, the 729 cases of the combination of ground properties (deformation modulus, cohesion, and internal friction angle) satisfying a Gaussian distribution were generated and applied. Also, stability of the tunnel was confirmed by analyzing the distribution of both displacement and shotcrete bending stress.
본 논문에서는 고속국도 제 12호선 담양-성산간의 양방향 터널의 설계 시, 지반 물성치의 불확실성을 고려하기 위해 위험도 분석에 근거하여 최적의 지보패턴 및 굴착방법을 결정하는 사례를 소개하였다. 이를 위해 지보량과 굴착방법이 다른 3 가지 적용 안을 선정하고, 터널의 안정성을 정량화할 수 있는 개념인 안전율을 사용하여 각각의 경우에 대해 Monte Carlo simulation 기법을 사용하여 위험도를 구하였다. 이때 결과의 신뢰도를 높이기 위하여 정규분포를 만족하는 총 729가지 경우의 지반물성치 조합 (변형계수, 점착력, 내부마찰각)을 생성하여 사용하였다. 또한 터널의 발생변위 및 숏크리트 휨응력 분포를 비교 분석하여 터널의 안정성을 확인하였다.