원가와 긴급 수요를 고려한 주문형 반도체 공장의 생산계획 연구

A Manufacturing Plan for Make-to-Order Semiconductor Plant Considering Cost and Urgent Demand

  • 이소원 (고려대학교 정보경영공학부) ;
  • 전형모 (한국 해양 수산 개발원) ;
  • 이준환 ((주)네오위즈 인터넷) ;
  • 이철웅 (고려대학교 정보경영공학부)
  • Lee, So-Won (Division of Information Management Engineering, Korea University) ;
  • Jeon, Hyong-Mo (Shipping, Port & Logistics Research Department, Korea Maritime Institute) ;
  • Lee, Joon-Hwan (Neowiz Internet) ;
  • Lee, Chul-Ung (Division of Information Management Engineering, Korea University)
  • 투고 : 2009.10.27
  • 심사 : 2010.12.13
  • 발행 : 2010.03.01

초록

A semiconductor market is one of the most competitive markets in the world. To survive this competition, important targets for production planning are on-time delivery and profit maximization. In our research, we modify the linear programming model for the current production planning by adding new objective functions that maximize the profit. In addition, we propose a production planning process that gives a priority to new products, reflecting daily fluctuations in demand to weekly production planning. We validate our model with real data sets obtained from a major company semiconductor manufacturer and performed the paired t-test to verify the results. The results showed that our model forecasted profit and loss with 93.2% accuracy and improved the due date satisfaction by 10%.

키워드

참고문헌

  1. Bae, J. S. and Han, J. K. (2002), Design of Advanced Planning System for Supply Chain Management Supporting ATP, Journal of the Korean Institute of Industrial Engineers, KAIST.
  2. Baek, J. K. (2002), A Study on Planning and Scheduling System for Make-to-Order Semiconductor Manufacturing, Ph. D. Dissertation, Korea University.
  3. Farley, G. A. (1997), Discovering Supply Chain Management:a Roundtable Discussion, APCIS-the Performance Advantage, 38-39.
  4. Glassey, C. R., and Resende, M. C. G. (1988), A Scheduling Rule for Job Release in Semiconductor Fabrication, Operations Research Letters, 7, 213-217. https://doi.org/10.1016/0167-6377(88)90033-8
  5. Ha, J. W. (2008), Critical Success Factors for the Implementation of Supply Chain Planning System, Entrue Journal of Information Technology, 7(1), 79-88.
  6. Ha, T. O. (2006), A Study on the Factors and Enablers that Affect on the Alignment of Plan with Execution in Supply Chain Management, Ph. D. Dissertation, KyungHee University.
  7. Kang, Y. H., Lee, H. C., and Kim, S. S. (1998), Scheduling Jobs with different Due-Date on Nonidentical Parallel Machines, Journal of the Korean Institute of Industrial Engineers, 24, 37-50.
  8. Lee, H. L., Padmanabhan, V., and Whang, S. (1997), Information distortion in a supply chain:The bullwhip effect, Management Science, 43(4), 546-558. https://doi.org/10.1287/mnsc.43.4.546
  9. Lee, B. K. (2008), Cost Strategy, 5th, Serowon Jean, 89-108.
  10. Lu, S. H., Ramaswamy, D., and Kumar, P. R. (1994) Efficient Scheduling Policies to Reduce Mean and Variance of Cycle-Time in Semiconductor Manufacturing Plants, IEEE Trans. On Semiconductor Manufacturing, 7, 374-388. https://doi.org/10.1109/66.311341
  11. Oliver, R., and Webber, M. (1982), Supply Chain Management:Logistics catches up with Strategy, in:Booz, Allen and Hamiton: Outlook.
  12. Ross, D. F. (1998), Competing through Supply Chain Management:Creating Market Winning Strategies Through Supply Chain Partnership, Kluwer Academic Publishers, Boston.
  13. Wein, L. M. (1998), Scheduling Semiconductor Wafer Fabrication, IEEE Trans. On Semiconductor Manufacturing, 1, 115-130.
  14. Yoon, H. J. and Lee, D. Y. (1999), Real-Time Scheduling of Wafer Fabrication with Multiple Product Types, Proceeding of the 1999 IEEE International Conference on Systems, Man, and Cybernetics, 835-84.