DOI QR코드

DOI QR Code

A Study on a Strategy to Enhance the Transparency of the Bidding and Contract System for Public Construction Projects

공공건설사업 입찰 및 계약제도측면의 투명성 확보 전략에 관한 연구

  • Received : 2010.11.06
  • Accepted : 2010.12.01
  • Published : 2010.12.20

Abstract

A construction project consists of many types of contracts. In the process of selecting the successful contractor after bidding, there will inevitably be fierce competition, which may lead to corruption or bribery. Even after signing the contract, during the period of settling the amount of the contract, bribery could occur. Such corruption could harm the development of the construction industry. It is, therefore, necessary to establish a strategy to prevent corruption by strengthening the transparency of the bidding process. In this study, to prevent corruption in the construction industry, a new service is proposed in which the successful bidder is selected by a professional third party, and the introduction of diverse delivery systems for construction projects and the invigoration of alternative methods of settling disputes are also proposed in this study.

찰자를 선정하는 과정에서 치열한 경쟁이 벌어지게 되며 이때 다양한 부패가 발생될 가능성이 있다. 계약체결후에도 공사금액의 결정과정에서 다양한 부패가 발생되기도 한다. 이러한 건설부패는 건전한 산업의 발전을 저해하기도 하고 그로 인해 다양한 피해를 유발시키기도 한다. 그러므로 건설공사의 투명성을 강화하여 부패를 방지하기 위한 전략을 수립할 필요성이 있다. 따라서 본 연구에서는 입찰계약제도 측면에서 건설부패를 최소화하기 위해 전문가에 의한 낙찰자 선정서비스 도입방안을 제시하고, 다양한 발주방식의 도입, 대체분쟁해결방법의 활성화 등을 제시하였다.

Keywords

References

  1. Kang SG. A problem of repeal of Korea Independent Commission Against Corruption based o UN Convention against Corruption. Government policy for corruption Symposium 2008:15-25.
  2. CCEJ. Announcement of CCEJ, Corruption Index and Establishment of A body to surveil Government(tentative name) 2000:8-24.
  3. Kim JS. Anti corruption Round is Coming, Ohmynews, 2005:Available from: http://www.ohmynews.com/nws_web/view/at_pg.aspx?CNTN_CD=A0000281528
  4. ACRC. White Book of Civil Right 2009:314.
  5. MOSF. A master plan to advance Government contract regulations 2010:1-10.
  6. Lee KS. The status and improvement of Turnkey delivery system, Construction Management, KICEM 2010;11(1):9-11
  7. Lee BN. Turnkey Method and Regulations. Construction Management 2010;11(1):5-8.
  8. Jang SP, Lee SH. A masterplan to improve construction Industry. Construction Vision 2020. Construction Management Technology and Movement III, KICEM 2009:289-293.
  9. Cho DK, Ahn HK. A suggestion of transparency of construction industry. Construction Vision 2020. Construction Management Technology and Movement III, KICEM 2009:17-19.
  10. Cho YJ. A strategy to secure construction transparency. An informal discussion at AIK 2010:1-4.

Cited by

  1. Effects of the Methods for Generating and Selecting Multiple Preliminary Prices on Budget Prices in Bidding Processes vol.15, pp.1, 2015, https://doi.org/10.5345/JKIBC.2015.15.1.089