References
- Bardow, A. K., Seraderian, R. L., and Culmo, M. P., “Design, Fabrication and Construction of the New England Bulb-Tee Girder,” PCI Journal, Vol. 42, No. 6, 1997, pp. 30-40.
- Castrodale, R. W. and White, C. D., NCHRP Report 517: Extending Span Ranges of Precast Prestressed Concrete Girders, Research Sponsored by the American Association of State Highway and Transportation Officials in Cooperation with the Federal Highway Administration, Transportation Research Board, Washington, D.C., 2004.
- Fitzgerald, J. B. and Stelmack, T. W., “Spliced Bulb-Tee Girders Bring Strength and Grace To Pueblo's Main Street Viaduct,” PCI Journal, Vol. 41, No. 6, 1996, pp. 40-54. https://doi.org/10.15554/pcij.11011996.40.54
- Garcia, A. M., “Florida's Long Span Bridges: New Forms, New Horizons,” PCI Journal, Vol. 38, No. 4, 1993, pp. 34-49.
- Janssen, H. H. and Spaans, L., “Record Span Spliced Bulb-Tee Girders Used in Highland View Bridge,” PCI Journal, Vol. 39, No. 1, 1994, pp. 12-19.
- PCI, New England Bulb Tee Post-Tensioned Design Guidelines, Report No. PCINER-01-PTDG, PCI, 2001.
- Rabbat, B. G. and Russell, H. G., “Optimized Sections for Precast Prestressed Bridge Girders,” PCI Journal, Vol. 27, No. 4, 1982, pp. 88-104. https://doi.org/10.15554/pcij.07011982.88.106
- Han, M. Y. and Hwang, E. S., “Development of Longer and Economical Incrementally Prestressed Concrete (IPC) Girder,” The 1st fib Congress, Osaka, Japan, 2002, pp. 87-88.
- Han, M. Y., Hwang, E. S., and Lee, C., “Prestressed Concrete Girder with Multistage Prestressing Concept,” ACI Structural Journal, Vol. 100, No. 6, 2003, 731 pp.
- Gergeley, P. and Sozen, M. A., “Design of Anchorage Zone Reinforcement in Prestressed Concrete Beams,” J. PCI, Vol. 12, No. 2, 1967, pp. 63-75. https://doi.org/10.15554/pcij.04011967.63.75
- Stone, W. C. and Breeen, J. E., “Design of Post-Tensioned Girder Anchorage Zones,” J. PCI, Vol. 29, No. 2, 1984, pp. 28-61.
- Richard, M. B. and Puckett, J. A., Design of Highway Bridges, Chicago, Illinois, 1997.
- Francis, J. J., “Study of Long Span Prestressed Concrete Bridge Girder,” PCI Journal, Mar.-Apr., 1971, pp. 24-42.
- Kathryn L. G., “Optimization of Precast/Prestressed Concrete Bridge I-Girder,” MS thesis, University of Nebraska, Lincoln, 1992.
- PCI Committee on Bridges, State-of-the-Art of Precast/Prestressed Concrete Spliced I-Girder Bridges, 1995.
- Mansur, M. A., Tan, K. H., and Wei W., “Effects of Creating an Opening in Existing Beams,” ACI Structural Journal, Vol. 96, No. 6, 1999, pp. 899-905.
- Ministry of Construction and Transportation, Korea Highway Bridge Design Specification, Korea, 2008.
- Mindess, S., Young J. F., and Darwin, D., Concrete, Second Edition, Prentice Hall, 2003.
- Stone, W. C. and Breeen, J. E., “Behavior of Post-Tensioned Girder Anchorage Zones,” J. PCI, Vol. 29, No. 1, 1984, pp. 64-109. https://doi.org/10.15554/pcij.01011984.64.109
Cited by
- Design Optimization and Structural Performance Evaluation of Plate Girder Bridge Constructed Using a Turn-Over Process vol.10, pp.3, 2017, https://doi.org/10.3390/ma10030283
- Flexural behaviour of a half-decked bulb tee pre-stressed concrete girder: full-scale test and nonlinear finite element analysis vol.13, pp.5, 2017, https://doi.org/10.1080/15732479.2016.1188126
- RC Arch Deck Development and Performance Evaluation for Enhanced Deck Width vol.12, pp.1, 2018, https://doi.org/10.1186/s40069-018-0295-y