Heat Transfer Study to Replace a Tube Bundle of Moisture Separator Reheater at Nuclear Power Plant

원전 습분분리재열기 튜브 번들 교체를 위한 열전달 고찰

  • 최유성 (한국전력공사 전력연구원) ;
  • 최광희 (한국전력공사 전력연구원 원자력발전연구소) ;
  • 이상국 (한국전력공사 전력연구원 원자력발전연구소)
  • Published : 2010.09.01

Abstract

The plugging rate of reheater tubes of Wolsung unit 1 nuclear power plant has been increased by corrosion and erosion since 1990. As the dimensions of the new first stage reheater bundle tubes which were supplied by Hanjung company to replace were different from old one, numerical calculations are carried out for flow and heat transfer in the reheater bundle tubes of the N.P.P. Numerical calculations consists of thermal performance, drain line pressure drop, flow change by pressure drop of line, stress analysis of finned tubes and analysis of flow induced vibration. Computational analysis using heat transfer research institute program is adopted to verify the results of the numerical calculations. It contains the evalution of performance in the system with view to location of the new reheater bundle and it shows the differences between the numerical calculation results and heat transfer research institute program output.

Keywords