Abstract
The ground fault is occupying 70% among the total number of faults in ungrounded distribution power system. When the ground fault occurs in ungrounded system, the fault current is so small that it is hard to detect. But fault handling is very important because to continue power supply during fault conditions may cause the fault spreading and the distribution device in trouble. This paper presents the fault line detection method by using GPT signal detecting zero sequence voltage, and the fault section detection method by detecting whether GPT signal is disappeared or not during shifting normally open switch, which is connecting switch between distribution lines with open state in order to restore the outage area under emergency situation, and during isolating each section one by one which belongs to the fault line. This method is efficient because there is no whole power interruption during the fault section detection, and it is possible to perform both the fault section detection and the service restoration for the outage area at the same time, and it can apply to various distribution system configuration. Program for the fault restoration was developed applying proposed method, and it has been validated by applying to the pilot project of distribution automation system in Vietnam which has the ungrounded distribution system.
비접지 배전계통에서 전체고장의 약 70%를 차지하는 지락고장 발생시에는 지락전류가 작아 검출이 어렵지만 고장상태로 전원 공급을 지속할 경우 사고 파급 및 기기 소손을 유발할 가능성이 있기 때문에 지락고장 처리는 매우 중요하다. 본 논문에서는 GPT(접지형 계기용 변압기, Ground Potential Transformer)에서 감지하는 영상전압 신호를 이용하여 고장선로를 검출하고, 비상시 연계선로를 이용하여 정전구역을 복구하기 위해 평상시 개폐기가 열려 있는 상태로 배전선로 사이를 연결하는 상시개방점을 이동하며 각 구간을 차례로 분리하면서 GPT 신호의 사라짐 여부를 감시하여 고장구간을 검출하는 방법을 제안한다. 고장구간 탐색 시 전체 정전이 없고, 고장구간 검출과 건전구간 복구가 동시에 가능하며 다양한 형태의 배전계통 구성에 적용 가능하다는 점에서 효율적이다. 본 논문에서 제안하는 고장처리 방법을 프로그램으로 개발하여 베트남 배전자동화 시범사업에 적용함으로써 알고리즘 및 프로그램의 적정성을 검증하였다.