References
- Bensaou, M. 'Portfolios of Buyer-Supplier Relationships.',Sloan Management Review(1999) 35-43
- Boudia, M., C. Prins. 'A memetic algorithm with dynamic population management for an integrated production-distribution problem.', European Journal of operational Research 195 (2009) 703-715 https://doi.org/10.1016/j.ejor.2007.07.034
- Huggins, EL., TL. Olsen. 'Supply chain management with guaranteed delivery.', Management Science 49(9) (2003) 1154-1167 https://doi.org/10.1287/mnsc.49.9.1154.16573
- Lee, YH. CH. Jeong, C. Moon. 'Advanced planning and Scheduling with outsourcing in manufacturing supply chain.', Computers & Industrial Engineering 43 (2002) 351-374 https://doi.org/10.1016/S0360-8352(02)00079-7
- Moon, C, Y. Seo. 'Evolutionary algorithm for advanced process planning and scheduling in a multi-plant.',Computers & Industrial Engineering 48 (2005) 311-325 https://doi.org/10.1016/j.cie.2005.01.016
- Moon, C., YH. Lee, CS. Jeong, YS. Yun. 'Integrated process planning and scheduling in a supply chain.', Computers & Industrial Engineering 54 (2008) 1048-1061 https://doi.org/10.1016/j.cie.2007.06.018
- So¨rensen, K., M. Sevaux. 'MA|PM: Memetic algorithms with population management.', Computers and Operations Research 33 (2006) 1214–1225 https://doi.org/10.1016/j.cor.2004.09.011
- Yang, B., AB. Badiru, S. Saripalli. 'A Facility Resource Scheduling for two stage supply chain.', Journal of the Korean Institute of Plant Engineering 10(1) (2005) 67-78
- Yimer, AS., K. Demirli. 'A genetic approach to two-phase optimization of dynamic supply chain scheduling.', Computers & Industrial Engineering (2009), Corrected Proof