Abstract

This paper proposes a novel technique for calculating the security costs that properly includes ramping constraints in the operation of a deregulated power system. The ramping process is modeled by a piecewise linear function with certain assumptions. During this process, a ramping cost is incurred if the permissible limits are exceeded. The optimal production costs of the power producers are calculated with the ramping cost included, considering a time horizon with N-1 contingency cases using contingency constrained optimal power flow (CCOPF), which is solved by the primal-dual interior point method (PDIPM). A contingency analysis is also performed taking into account the severity index of transmission line outages and its sensitivity analysis. The results from an illustrative case study based on the IEEE 30-bus system are analyzed. One attractive feature of the proposed approach is that an optimal solution is more realistic than the conventional approach because it satisfies physical constraints, such as the ramping constraint.

Keywords

References

  1. Song, Y. H and Wang, X. F, Operation of Marketoriented Power Systems, Springer. 2003
  2. Tamimi, B. and VaezZadeh, S., An Optimal Pricing Scheme in Electricity Markets Considering Voltage Security Cost, IEEE Transactions on Power Systems, Vol. 23, No. 2, May 2008
  3. Shariati, H., Askarian, A. H, Javidi, M. H. and Razavi, F, Transmission expansion planning considering security cost under market environment, Electric Utility Deregulation and Restructuring and Power Technologies, April 2008
  4. Hong, C., Canizares, C. A and Singh. A., Web-based security cost analysis in electricity markets, IEEE Transactions on Power Systems, Vol. 20, No. 2, May 2005
  5. Wang, C. and Shahidehpour, S. M., Effects of Ramprate limits on Unit Commitment and Economic Dispatch, IEEE Transactions on Power Systems, Vol. 8, No. 3, Aug. 1993
  6. Alva, J. S., Tseng, C. L., Li, C. A. and Raymond B. Johnson, Short-Term Resource Scheduling with Ramp Constraints, IEEE Transactions on Power Systems, Vol. 12, No. 1, Feb. 1997
  7. Han, X. H, Gooi, H. B. and Venkatesh, B., Dispatch Problems Due to Ramp Rate Constraints: Bottleneck Analysis and Solutions, Electric Power Components and Systems, Vol. 31, No. 10, Oct. 2003
  8. Kim, M. K., Hur, D., and Park, J. K., Determination of available transfer capability using multi-objective contingency constrained optimal power flow with post-contingency corrective rescheduling, Electrical Engineering, April, 2008
  9. Anitha, M., Subramanian, S., and Gnanadass, R., Optimal production cost of the power producers with linear ramp model using FDR PSO algorithm, European Transactions on Electrical Power, Oct. 2008
  10. Hua, W., Sasaki, H., and Kubokawa, J., An Interior Point Nonlinear Programming for Optimal Power Flow Problems with A Novel Data Structure, IEEE Transactions on Power Systems, Vol. 13, No. 3, Aug. 1998
  11. Yamin, H. Y., Dynamic Optimal Power Flow Using Interior Point Method and Benders Decomposition Considering Active and Reactive Constraints, Electric Power Components and Systems, Vol. 34, No. 12, Dec. 2006
  12. Lin, W. M, and Chen, S. J., Bid-based dynamic economic dispatch with an efficient interior point algorithm, Electrical Power and Energy Systems, Vol. 24, 2002
  13. Stott, B., Alsac, O., and Monticelli, A.J., Security analysis and optimization, Proceedings of the IEEE, Vol. 75, No. 12, Dec. 1987

Cited by

  1. Decomposition–coordination strategy to improve power transfer capability of interconnected systems vol.33, pp.10, 2011, https://doi.org/10.1016/j.ijepes.2011.06.028
  2. A new approach to security-constrained generation scheduling of large-scale power systems with a piecewise linear ramping model vol.34, pp.1, 2012, https://doi.org/10.1016/j.ijepes.2011.09.013
  3. Dynamic Ramping Model Including Intraperiod Ramp-Rate Changes in Unit Commitment vol.8, pp.1, 2017, https://doi.org/10.1109/TSTE.2016.2578302
  4. Market-clearing for pricing system security based on voltage stability criteria vol.36, pp.2, 2011, https://doi.org/10.1016/j.energy.2010.11.019
  5. Total transfer capability computation using small signal stability-based security constrained optimal power flow vol.21, pp.1, 2011, https://doi.org/10.1002/etep.483