Abstract
This paper proposes a new fault restoration method which adopts the recloser as top agent to release the problems of the data concentration and fault processing delay of the existing DAS(distribution Automation System) under the ubiquitous distribution system. In proposed method, top agent collects the data based on the multi-casting communication with the tie switches of the interconnection point, and then selects a closed switch(tie switch) to transfer the sound outage load to other feeders based on the heuristic search strategy step by step until the load transfer work is finished. Here, a new heuristic rule is developed which can guarantee the relational load balancing and line loss from the collected voltage data. Finally, the several faults are simulated for typical multi-section and multi-interconnection distribution system to prove the effectiveness of the proposed strategy, in particular, for each simulation cases, the load balancing index and line loss index of the obtained solution from the proposed method is compared with those of all of feasible solutions.