References
- 김여근, 윤복식, 이상복, [메타휴리스틱], 영진출판사, 1997.
- Avic, S., M.S. Akturk and R.H. Storer, "A problem space algorithm for single machine weighted tardiness problems", IIE Transactions, Vol.35, pp.479-486, 2003. https://doi.org/10.1080/07408170304390
- Demirkov, E. and R. Uzsoy, "Decomposition methods for reentrant flow shops with sequence-dependent setup times", Journal of Scheduling, Vol.3, pp.155-177, 2000. https://doi.org/10.1002/(SICI)1099-1425(200005/06)3:3<155::AID-JOS39>3.0.CO;2-E
- Flapper, S.D.P., J.C. Fransoo, R.A.C.M. Broekmeulen and K. Inderfurth, "Planning and control of rework in the process industries : review", Production Planning & Control, Vol.13, No.1, pp.26-34, 2002. https://doi.org/10.1080/09537280110061548
- Kim, S.C. and P.M. Bobrowski, "Impact on sequence-dependent setup time on job shop scheduling performance", International Journal of Production Research, Vol.32, No.7, pp.1503-1520, 1994. https://doi.org/10.1080/00207549408957019
- Kuhl, M.E. and G.R. Laubisch, "A simulation study of dispatching rules and rework strategies in semiconductor manufacturing", IEEE/SEMI Advanced Semiconductor Manufacturing Conference, 2004. https://doi.org/10.1109/ASMC.2004.1309590
- Leon,V.J. and B. Ramamoorthy, "strength and adaptability of problem space based neighborhoods for resource-constrained scheduling", Operations Research Spektrum, Vol.17, No.2, pp.173-182, 1995. https://doi.org/10.1007/BF01719262
- Leon, V.J. and B. Ramamoorthy, "An adaptable problem-space based search method for flexible flow line scheduling", IIE Transactions, Vol.29, pp.115-125, 1997.
- Sha, D.Y., S.Y. Hsu, Z.H. Che and C.H. Chen, "A dispatching rule for photolithography scheduling with an online rework strategy.", Computers & Industrial Engineering, Vol.50, pp.233-247, 2006. https://doi.org/10.1016/j.cie.2006.04.002
- Storer, R.H., S.D. Wu and R. Vaccari, "New search spaces for sequencing problems with application to job shop scheduling", Management Science, Vol.38, No.10, pp.1495-1509, 1992. https://doi.org/10.1287/mnsc.38.10.1495
- Turkcan, A. and M.S. Akturk, "A problem space algorithm in multi-objective optimization", Journal of Intelligent Manufacturing, Vol.14, pp.363-378. https://doi.org/10.1023/A:1024605927329
- Uzsoy, R., C.Y. Lee and L.A. Martin-Vega, "A review of product planning and scheduling models in the semiconductor industry Part I : Systems characteristics, performance evaluation and production planning", IIE Transaction on Scheduling and Logistics, Vol.24, No.4, pp.47-61, 1992.
- Uzsoy, R., C.Y. Lee and L.A. Martin-Vega, "A review of product planning and scheduling models in the semiconductor industry Part II : Shop-floor control", IIE Transaction on Scheduling and Logistics, Vol.26, No.5, pp.44-55, 1994.