DOI QR코드

DOI QR Code

Development and Application of the Methodology to Establish Life Extension and Modernization Plan of Aged Hydropower Plants

노후 수력 발전소의 수명연장 및 현대화 계획 수립 방법론 개발 및 적용

  • Published : 2009.10.01

Abstract

This paper provides how to establish an integrated plan for LE (life extension) and MD (modernization) of aged hydropower plants. The methodology is developed through review of overseas/domestic LE/MD histories, investigation of the previous overseas methodologies and consideration of domestic practices. The methodology includes reviews of the various factors such as condition, operation and maintenance history, up-to-date technology, and economic benefit. In order to establish the life extension/modernization plan, the methodology is applied to the domestic aged hydropower plants. Finally, priority rankings and draft practice plans for LE/MD are derived.

Keywords

References

  1. Electricity Collaboration Association, Pyoung Sung 16, Guideline for Maintenance of Principal Equipments in Hydro Power Plant, Electricity Collaboration Research, Vol. 50, No. 3
  2. PRI, 1999, Hydropower Technology Round-up Report, Volume 2: Rehabilitating and Upgrading Hydro Power Plants, EPRI TR-113584-V2
  3. U.S. DOE, 2006, Replacement Units Service Lives Factors
  4. Alstom, 2002, Refurbishment Highlights
  5. EPRI, 1999, Hydro Life Extension Modernization Guide, EPRI TR-112350
  6. EdF, 2004, Framework for Policy & Decision-Making Dam and Hydro Plant Rehabilitation & Uprating
  7. Franseen, H., et al., 2003, APGI Hydropower Modernization, A Partnered Process Approach to System Optimization

Cited by

  1. Evaluation of Effect of Low Opening Operation on Increasing Wear of Bearing Bushings of Guide Vanes used in Hydropower Plants vol.36, pp.10, 2012, https://doi.org/10.3795/KSME-A.2012.36.10.1267
  2. Improving the Reliability of Pumped-Storage Power Plants in the Operational Phases using Data Mining Algorithms pp.1976-3808, 2018, https://doi.org/10.1007/s12205-017-1053-4