DOI QR코드

DOI QR Code

Improved Pre-prepared Power Demand Table and Muller's Method to Solve the Profit Based Unit Commitment Problem

  • Chandram, K. (Department of Electrical Engineering, National Institute of Technology) ;
  • Subrahmanyam, N. (Department of Electrical Engineering, National Institute of Technology) ;
  • Sydulu, M. (Department of Electrical Engineering, National Institute of Technology)
  • Published : 2009.06.30

Abstract

This paper presents the Improved Pre-prepared Power Demand (IPPD) table and Muller's method as a means of solving the Profit Based Unit Commitment (PBUC) problem. In a deregulated environment, generation companies (GENCOs) schedule their generators to maximize profits rather than to satisfy power demand. The PBUC problem is solved by the proposed approach in two stages. Initially, information concerning committed units is obtained by the IPPD table and then the subprob-lem of Economic Dispatch (ED) is solved using Muller's method. The proposed approach has been tested on a power system with 3 and 10 generating units. Simulation results of the proposed approach have been compared with existing methods and also with traditional unit commitment. It is observed from the simulation results that the proposed algorithm provides maximum profit with less computational time compared to existing methods.

Keywords

References

  1. Narayana Prasad Padhy, 'Unit Commitment-A Bibliographical Survey', IEEE Trans on Power Systems, vol. 19, no. 2, May 2004
  2. Attaviriyanupap, P., Kita, H., Tanaka, E., and Hasegawa, J., 'A hybrid LR-EP for solving new profit-based UC problem under competitive environment', IEEE Transactions on power systems, vol. 18, no. 1, Feb. 2003, pp: 229: 237 https://doi.org/10.1109/TPWRS.2002.807080
  3. Li, T., and Shahidehpour, M., 'Price-based unit commitment: A case of lagrangian relaxation versus mixed integer programming', IEEE Transaction on Power System, vol. 20, no. 4, November 2005, pp: 2015- 2025 https://doi.org/10.1109/TPWRS.2005.857391
  4. Pokharel, B.K., Shrestha, G.B., Lie, T.T., and Fleten, S. E., 'Price basεd unit commitment for Gencos in deregulated markets', Proceeding of the IEEE Power Engineering Society General Meeting, 12-16 June, 2005, pp. 2159 -2164
  5. Xiaohui, Y., Yanbin, Y., Cheng, W., and Xiaopan, Z., 'An improved PSO approach for profit-based umt commltmεnt in electricity market', IEEEIPES Trans- mission and Distribution conference & Exhibition: Asia and Pacific, Dalian, China, 2005
  6. Richter, Jr., Charles W., and Sheble, Gerald B., 'A Profit-Based Unit Commitment GA for the Competitive Environment', IEEE Transactions on Power Systems, vol. 15, no. 2, May, 2000, pp. 715- 721 https://doi.org/10.1109/59.867164
  7. Victoire, T.A.A., Jeyakumar, A.E.: 'Unit commitment by a tabu-search-based hybrid-optirnisation technique', IEE Proc.-Gener. Transm. Distrib., vol. 152, no. 4, July 2005 pp 563 https://doi.org/10.1049/ip-gtd:20045190
  8. Shahidehpour M., Hatim Yamin and Zuyi Li, 'Market Operations in Electric Power Systems: Forεcasting, Scheduling, and Risk Managemεnt' The Institute of Electrical and Electronics Engineers, Inc., New York
  9. Muller, D.E., 'A method of solving algebraic equations using an automatic computer, Math Tables and Other Aids to Computation 10', 208-215, (1956)
  10. Costabile, F., Gualtieri, M.I., and Luceri, R., 'A modification of Muller’s method', CALCOLO 43, 39 -50 (2006) springer verilog https://doi.org/10.1007/s10092-006-0113-9
  11. Dieu, V.N., and Ongsakul, W., 'Ramp rate constrained Unit Commitment by Improved priority list and augmented lagrange Hopfield network', Electric Power Systems Research, volume 78, no. 3, March 2008, Page 291-301 https://doi.org/10.1016/j.epsr.2007.02.011

Cited by

  1. A New Binary Variant of Sine–Cosine Algorithm: Development and Application to Solve Profit-Based Unit Commitment Problem 2017, https://doi.org/10.1007/s13369-017-2790-x
  2. Evaluation of Two Lagrangian Dual Optimization Algorithms for Large-Scale Unit Commitment Problems vol.7, pp.1, 2012, https://doi.org/10.5370/JEET.2012.7.1.17
  3. Optimal power scheduling of thermal units considering emission constraint for GENCOs’ profit maximization vol.82, 2016, https://doi.org/10.1016/j.ijepes.2016.03.011
  4. Profit based unit commitment for GENCOs using parallel NACO in a distributed cluster vol.10, 2013, https://doi.org/10.1016/j.swevo.2012.11.005
  5. Hybrid Artificial Immune System Approach for Profit Based Unit Commitment Problem vol.8, pp.5, 2013, https://doi.org/10.5370/JEET.2013.8.5.959
  6. An ICA based approach for solving profit based unit commitment problem market vol.38, 2016, https://doi.org/10.1016/j.asoc.2015.10.026
  7. Binary fireworks algorithm for profit based unit commitment (PBUC) problem vol.83, 2016, https://doi.org/10.1016/j.ijepes.2016.04.005
  8. Profit Based Unit Commitment using Hybrid Optimization Technique 2018, https://doi.org/10.1016/j.energy.2018.01.138
  9. Binary whale optimization algorithm: a new metaheuristic approach for profit-based unit commitment problems in competitive electricity markets pp.1029-0273, 2018, https://doi.org/10.1080/0305215X.2018.1463527