References
- H. Yumura, T. Masuda, M. Watanabe, H. Takigawa, Y. Ashibe, H. Ito, M. Hirose and K. Sato "Albany HTS Cable Project Long Term In-Grid Operation Status Update", Advances in Cryogenic Engineering, vol. 53, pp. 1051-1058, 2008 https://doi.org/10.1063/1.2908453
- S.H. Sohn, J.H. Lim, S.W. Yim, O.B. Hyun, Hl.R. Kim, K. Yatsuka, S. Isojima, T. Masuda, M. Watanabe, H.S. Ryoo, H.S. Yang, D.L. Kim and S.D. Hwang "The Results of Installation and Preliminary Test of 229kV, 50MVA. 100m Class HTS Power Cable System at KEPCO", IEEE Trans. on Appl. Supercond., vol. 17, pp.2043-2046, 2007 https://doi.org/10.1109/TASC.2007.897764
- S.H. Sohn, S.D. Hwang. J.H. Lim, S.W. Yim, O.B. Hyun, H.R. Kim, K. Yatsuka, T. Masuda, S. Isojima, M. Watanabe, H.S. Ryoo, H.S. Yang, D.L. Kim "Verification test of 22.9kV underground HTS cable", Physica C, pp.1146-1149, 2007 https://doi.org/10.1016/j.physc.2007.04.254
- H.S. Yang, D.L. Kim, B.S. Lee, Y.S. Choi, S.H. Sohn. J.H. Lim, H.S. Ryoo and S.D. Hwang "Performance Test of Cooling System for KEPCO HTS Power cable", Advances in Cryogenic Engineering, vol. 53, pp. 1067-1072, 2008 https://doi.org/10.1063/1.2908455
- J.H. Lim, S. H. Sohn, H.S. Yang, D.L. Kim, H,S. Ryoo, and S.D. Hwang, "The Test Result of Cooling Test on HTS Power Cable of KEPCO", Advances in Cryogenic Engineering, vol. 53, pp.1209-1216, 2008 https://doi.org/10.1063/1.2908475