참고문헌
- D. L. Loveday, G. S. Virk. "The Development of Advanced Control Algorithms for BEMS", Control in Building Energy Management Systems, IEE Colloquium on 30, pp. 21-24, 1990
- Cheung, J.Y.M., Virk, G.S., Loveday, D.L., "Model based controllers for BEMS", Industrial Applications of Model Based Predictive Control, IEE Colloquium on 21, pp. 21-26, 1991
- K. Y. Lain, "Output Tracking Control for Fuzzy Systems Via Output Feedback Design", IEEE Transactions on fuzzy systems, vol. 14, no. 5, pp. 628-639. 2006 https://doi.org/10.1109/TFUZZ.2006.876725
- E. H. Barakat, J. M. Al-qasem, "Methodology for weekly load forecasting", IEEE Transactions on Power Systems, vol. 13, no. 4, pp. 1548-1555, 1998 https://doi.org/10.1109/59.736304
- 박후식, 문경준, 김형수, 황기현, 이화석, 박준호, "전력 부하의 유형별 단기부하예측에 신경회로망의 적용", 대한전기학회논문지, vol. 48A, no. 1, pp. 8-14. 1999
- C.N. Lu, H. T. Wu, "Neural network based short term load forecasting", IEEE Transactions on Power Sys tems, vol. 8, no. 1, pp. 336-342. 1993 https://doi.org/10.1109/59.221223
- N. Amjady, "Short-term hourly load forecasting using time series modeling with peak load estimation cap- ability," IEEE Transactions on Power Systems, vol. 16, pp. 498-505, 2001 https://doi.org/10.1109/59.932287
- H. Mori and A. Yuihara, "Deterministic annealing clustering for ANN-based short-term load forecasting, "IEEE Transaction on Power Systems, vol. 16, pp. 545-551, 2001 https://doi.org/10.1109/59.932293
- Titti Saksornchai, Wei-Jen Lee, "Improve the Unit Commitment Scheduling by Using the Neural-Network Based Short-Term Load Forecasting", IEEE Transactions on Industry Applications, vol. 41, no. 1, pp. 169- 179, 2005 https://doi.org/10.1109/TIA.2004.841029
- Hsiao-Yi Huang, Jia-Yush Yen, "Development of a Intelligent Energy Management Network for Building Automation", IEEE Transactions on Automation Science and Engineering, vol. 1, no. 1, pp. 14-25, 2004 https://doi.org/10.1109/TASE.2004.829346
- 정기철, 양해원, "DRNN을 이용한 최적 난방부하 식별", 대한전기학회논문지, vol. 48A, no.10, pp. 1231-1238, 1999
- 박영진, 심현정, 왕보현, "뉴로-퍼지 모델을 이용한 단기 전력 수요 예측시스템", 대한전기학회논문지, vol. 49A, no. 3, pp. 107-117, 2000
- 송경빈, 구본석, 백영식, "퍼지 최소 자승 선형회귀분석 알고리즘을 이용한 특수일 전력수요예측" 대한전기학회논문지, vol. 52D, no. 4, pp. 233-237, 2003
- S. Wang and J. Xie, "Integrating building management system and facilities management on the internet," Automat. Construct., vol. 11, no. 6, pp. 707–715, 2002 https://doi.org/10.1016/S0926-5805(02)00011-0
- G. Clark and P. Mehta, "Artifical intelligence and networking in integrated building management systems," Automat. Construct., vol. 6, no. 5-6, pp. 481-498, 1997 https://doi.org/10.1016/S0926-5805(97)00026-5