A Study on Developing the Calculation System of Disbursement for Government on the BTL Projects

BTL사업을 위한 정부지급금 산출 시스템 개발 연구

  • Published : 2009.03.31

Abstract

BTL projects, which has been 3 years since it was carried out in 2008, trigged the controversy on the adequacy in the calculation of disbursement for Government due to such problems as low earning rate and the burden of service level compared with the project suggestion. Thus, the purpose of this study is to offer a suggestion on the calculation system for the purpose of the standardized - expense appropriation by item and database including the antecedent study on the finance model and the feasibility in BTL projects. The system is composed of 4 steps - project management, basic database, an analysis on expense by item and the result, and an analysis on sensitivity, and it is possible to carry out a comparative analysis on single and multi alternatives by variable change along with the ground on expense calculation.

2008년 시행 3년차를 맞이하는 BTL사업은 정부의 재정형편으로는 OECD국가 수준에 버금가는 공공서비스를 제공하기 역부족인 상황을 조기에 인지하여 민간자원의 선 투입으로 높은 수준의 공공서비스와 적절한 시기에 필요시설을 확충하고자 하는 목적으로 국내 건설시장에 도입되었다. 그러나 낮은 사업수익률과 사업제안비용 대비 서비스 수준의 부담 등을 문제로 BTL사업의 정부지급금 산출에 대한 적정성 논란이 야기되고 있다. 이를 위하여 본 연구에서는 정부지급금을 비롯한 총 사업비의 비용항목별 계상 알고리즘을 기반으로 정부지급금 산출 시스템을 개발하였다. 프로젝트 관리, 기초데이터, 항목별 비용분석 및 결과, 민감도 분석 등 4단계로 구성되었으며 비용 산출근거와 더불어 변수 변화에 의한 복수, 단일대안에 대한 비교분석이 가능하다. 보다 효율적인 정부지급금 산출을 유도하고 규모별 시설별 대안에 비교분석을 통하여 사업 타당성을 확보할 수 있다. 본 연구에서는 BTL사업에 대한 재무모델과 타당성 분석에 대한 선행연구를 시작으로 주요 항목별 표준화된 비용계상과 데이터베이스화를 목적으로 정부지급금 산출 시스템을 제안하고자 한다.

Keywords

References

  1. 건설공제조합, 정부입찰계약실무과정 교재, 2006
  2. 이춘경 외 3인, BTL사업의 효율적인 사업비용 산출을 위한 현황조사 및 개선방안에 관한 전문가 의식조사연구, 대한건축학회논문집(구조계), 2008.07
  3. 한국건설교통기술평가원, BTL사업을 위한 경제성 평가 시스템 개발 연구 2차년도 중간보고서, 2007.12
  4. 한국건설산업연구원, BTL사업 추진일반/전문과정 교재, 2006
  5. 한국교육개발원, 교육시설 BTL 운영관리 표준 매뉴얼, 2007
  6. BELCA, PFI사업 발주자를 위한 15가지 제언, 2006
  7. 일간건축공업신문사, PFI의 자금조달, 2006