DOI QR코드

DOI QR Code

Analysis of Failure Behavior of the Box Culvert with 3-Axes Loading System

3축 가력시스템에 의한 박스형 암거의 파괴거동 분석

  • 우상균 (한국전력연구원 녹생성장연구소) ;
  • 권용길 (충북대학교 건설기술연구소) ;
  • 조준형 (한국전력연구원 녹생성장연구소) ;
  • 한상훈 (충북대학교 토목공학과)
  • Received : 2009.06.08
  • Accepted : 2009.07.26
  • Published : 2009.09.30

Abstract

This paper is to investigate the fracture behavior characteristics of box culvert and incremental crack width of upper slab for the incremental loading by the 3-axis loading system. In the 3-axes loading system, loading directions are upper side, left and right side which simulate earth pressure and static traffic load. With the incremental load, crack patterns is investigated on the upper slab, left and right wall. Especially, on the upper slab, crack width is measured by crack gage. Based on the experimental results, structural internal force indices of box culvert are estimated quantitatively.

이 논문에서는 3축 가력상태에 놓인 박스형 암거의 극한파괴실험을 실시하고 박스형 암거의 파괴거동 특성을 파악하고 하중증가에 따른 균열폭의 변화를 측정하였다. 현실적인 외압상태를 모사하기 위해 상부 및 좌,우측부에서 동시에 가력할 수 있는 3축 가력시스템을 이용하여 하중을 재하 하였다. 하중 증가에 따른 상부슬래브 및 좌,우측 벽체에서의 균열양상을 관찰하였으며 상부슬래브에서의 균열폭 증가량을 정량적으로 측정하였다. 이를 통해 균열폭 증가에 따른 구조손상도를 실험적으로 정량화시켜 박스형 암거의 구조내력저하지수를 실험적으로 추정하였다.

Keywords

References

  1. 本田国保ら: 水平載荷によるボックスカルバートの変形性能の実験的研究,コンクリート工学年次論文報告集,Vol.21,No.3,pp.1261~1266,1999
  2. 斎藤など, "水路トンネル健全性評価支援システムの開発"、電力土木, No.304, pp.51~55, 2003
  3. 安保など, "水路トンネル管理システムの開発" 電力土木, No.287, pp.42~46, 2000
  4. 星隈順一ら: 鉄筋コンクリート橋脚の変形性能に及ぼす断面寸法の影響に関する研究, 土木学会論文集, No.669/V-50,pp.215~232,2001
  5. 木村など, "水力発電所土木工作物点検管理支援システムの開発"、電力土木, No.292, pp.24~28, 2001
  6. Osako, K., Koiwa, S. , Kitahashi,N., Akimoto,E. and Nakatsui, K., "A rehabilitation technology by SPR method and evaluation of load carrying capacity", Proceedings of JCI Symposium on Repair and rehabilitation of concrete structures, 1998
  7. Shi, Z., Nakano, M. , Ishibashi, A., and Yoshida,T., “Assessment of load carrying capacity of tunnel lining with inner reinforcement by the elastic softening model”, Proceedings of JCI Symposium on Repair and rehabilitation of concrete structures, pp.83~86, 1998
  8. Yokoyama, H., Osako, K., Koiwa, S., Kitahashi, N., and Akimoto, E. "A new technique for sewer rehabilitation applicable to noncircular cross sections : Development and Application", 1997