DOI QR코드

DOI QR Code

A Case Study on Reason Analysis for Schedule Delay of Apartment House

공동주택의 공기지연 원인분석 사레 연구

  • Published : 2009.02.20

Abstract

A study was performed the analysis for the schedule delay of the public housing. To perform this study, the first study existing research literature on the cause of the schedule delay was considered. The based on existing study, this study selected the cause of schedule delay. For check of the schedule delay, this study was compared the monthly schedule and the work diary. Survey was conducted for using the selected cause of schedule delay. And the importance was calculated for using the AHP method. In a case site, the cause of the schedule delay was analyzed. The last, the delay cause was presented the map of cause of effect the based on the delay cause of a case site.

Keywords

References

  1. 구자민, 이재섭, 2004. 생산성을 고려한 건설공사 공기지연분석방법, 대한건축학회논문집 구조계, 20권 4호
  2. 김도훈, 문태훈, 김동환, 1999, 시스템 다이내믹스, 대영문화사
  3. 김태우, 이재섭. 2005. 시스템 사고를 이용한 건설공사 동시발생 공기지연 분석방법, 대한건축학회 학술발표대회 논문집, 제25권 제1호
  4. 류한국, 2003. 손실생산성을 고려한 공기지연일수 산정방법, 서울대학교 대학원
  5. 모용운, 김영재, 김경래, 2002, 국내 공공건설공사 공기지연 분석모델 개발, 대한건축학회 논문집(구조계), 제18권 제2호
  6. 이재섭, 2005. 계약당사자 모두에게 책임이 있는 공기지연의 해석방법, 대한건축학회논문집 구조계. 21권 8호
  7. 이재섭, 이현수. 1999. 건설공사 공기지연일수 분석방법, 대한건축학회 논문집 구조계 15권 9호
  8. 조훈희, 오수양, 김경래, 2001, 공기연장 실태조사를 통한 발주자 중심 공기지연 리스크 대응방안, 대한건축학회 논문집(구조계), 제17권 제12호
  9. 한종관, 진상윤, 김예상. 2003. 시공자 중심의 주요 공종별공기지연 원인분석에 관한 연구, 대한건축학회논문집 구조계,19권 3호
  10. Bramble, B. B. and Callahan, N. T., Construction Delay Claims, 2nd Ed., John Wiley & Sons, 1992

Cited by

  1. Effect of Plant Roots Penetration and Watertightness of Asphalt Sheet according to the Cracks Width of Press Concrete vol.20, pp.1, 2016, https://doi.org/10.11112/jksmi.2016.20.1.112
  2. A Non-working Period Estimation Model Reflecting the Characteristics of the Construction Trades vol.32, pp.2, 2016, https://doi.org/10.5659/JAIK_SC.2016.32.2.41
  3. A Study on the Joint Property by the Surface Treatment Method on the Jointing Method of PET Film using the High Hardness Liquid vol.18, pp.3, 2014, https://doi.org/10.11112/jksmi.2014.18.3.153
  4. Developing a construction duration estimation model to ensure the safety in apartment housing construction sites 2018, https://doi.org/10.1007/s12205-017-0605-y