DOI QR코드

DOI QR Code

Making Decision of the Maintenance Priority of Power Distribution System using Time Varying Failure Rate and Interruption Cost

  • Chu, Cheol-Min (Dept. of Power Distribution Lab., Korea Electric Power Research Institute) ;
  • Kim, Jae-Chul (Dept. of Electrical and Electronic Engineering, Soongsil University) ;
  • Yun, Sang-Yun (Dept. Electrotechnology R&D Center, LS Industrial Systems)
  • Published : 2009.03.01

Abstract

The purpose of the this paper is to make decision of the maintenance priority of power distribution system using Time-Varying Failure Rate(TVFR) with interruption cost. This paper emphasizes the practical use of the reliability indices and interruption cost. To make a decision of maintenance priority on power distribution system equipment, the quantification of the reliability level should be represented as a cost. In this paper, the TVFR of power distribution system equipment applied in this paper utilizes analytic method to use the historical data of KEPCO. From this result, the sensitivity analysis on TVFR of equipment was done for the priority, which represents that high priority of the equipment has more effect on system reliability, such as SAIDI or SAIFI, than other equipment. By this priority, the investment plan is established. In this result, customer interruption cost(CIC) could be extracted, and CIC is used as weighting factor to consider a importance of customer. After that, the result calculated the proposal method in this paper is compared with other priority method, such as lifetime, failure rate or only sensitivity.

Keywords

References

  1. Billinton. R, Ronald N. Allen, 'Reliability Evaluation of Power Systems', Plenum Press, 1984
  2. Sang-Bong Choi, 'A Study on the Reliability Evaluation of Underground Distribution System', KlEE, Vol 50A No7 July 2001
  3. Billinton R. and R. N. Allan, 'Reliability Evaluation of Engineering Systems : Concepts and Techniques. New York', Plenum, 1992
  4. H. Lee Willis, Gregory V. Welch, Randall R. Schriceber, 'Aging Power Delivery Infrastructures', ABB Power T&D Company Inc, 2001
  5. Hee-Tae Lee, 'Component Replacement Ordering Evalu-ation for Proper Reliability Maintenance in Power Distribution System', KlEE, July. 2005
  6. Choi, J.H, Park, C.H, 'An improved investment priority decision method for the electrical facilities considering rεliability of distribution networks', Power Engineering Society General Meeting, Vol 3 page 2185-2191, June 2005
  7. Park, C.H, Development of Korea Distribution Power System Asset Management System, KEPCO, 2006
  8. Lee, S.Y, Reliability Engneering, Heyng-sul Press, 2003
  9. R. Billinton, P. Wang, 'Reliability-network-equivalent approach to distribution-system-reliability evaluation', IEE Proc.-Gener. Transm. Distrib, Vol. 145, No. 2, March 1998
  10. Sang-Bong Choi, 'A Studyon the Reliability Evaluation of Underground Distribution System', KlEE. Vol 50A No 7 July 200l

Cited by

  1. Lifetime efficiency index model for optimal maintenance of power substation equipment based on cuckoo optimisation algorithm vol.11, pp.11, 2017, https://doi.org/10.1049/iet-gtd.2016.1719