DOI QR코드

DOI QR Code

A Study on the Deriving Requirements of ARGO Operation System

  • Published : 2009.12.15

Abstract

Korea Astronomy and Space Science Institute (KASI) has been developing one mobile and one stationary SLR system since 2008 named as ARGO-M and ARGO-F, respectively. KASI finished the step of deriving the system requirements of ARGO. The requirements include definitions and scopes of various software and hardware components which are necessary for developing the ARGO-M operation system. And the requirements define function, performance, and interface requirements. The operation system consisting of ARGO-M site, ARGO-F site, and Remote Operation Center (ROC) inside KASI is designed for remote access and the automatic tracking and control system which are the main operation concept of ARGO system. To accomplish remote operation, we are considering remote access to ARGO-F and ARGO-M from ROC. The mobile-phone service allows us to access the ARGO-F remotely and to control the system in an emergency. To implement fully automatic tracking and control function in ARGO-F, we have investigated and described the requirements about the automatic aircraft detection system and the various meteorological sensors. This paper addresses the requirements of ARGO Operation System.

Keywords

References

  1. Broomhall, M. A. 2003, MS Thesis, Curtin University of Technology
  2. Lim, H. C. & Lee, J. Y. 2009, Korea Astronomy and Space Science Institute Project Document (ARGO-M System Design Review), ARGO-SDR-601-001
  3. McGarry, J., Conklin, B., Mann, A., Sadeghighassami, M., Perry, M., Cheek, J., Mallama, T., Ton, N., & Ricklefs, R. 1998, NASA/GSFC SLR2000 Software Design Document
  4. Park, J. U., Lim, H. C., Seo, Y. K., Kim, Y. S., Park, J. H., Son, Y. S., & Kim, Y. K. 2008, in 16th International Workshop on Laser Ranging proceedings, New and Upgraded Stations, Extended Facilities (in press)
  5. Pearlman, M. R., Degnan, J. J., & Bosworth, J. M. 2002, Advances in Space Research, 30, 135 https://doi.org/10.1016/S0273-1177(02)00277-6
  6. Seo, Y. K., Lim, H. C., Yim, H. S., Park, I. K., Ryu, J. H., & Lee, H. J. 2009, Korea Astronomy and Space Science Institute Project Document (Operation System Requirements Document for ARGO-M), ARGO-REQ-660-F00

Cited by

  1. A study on tracking method and normal point formation algorithm of new mobile SLR system in Korea vol.39, pp.4, 2011, https://doi.org/10.5139/JKSAS.2011.39.4.370
  2. A new approach to the telescope operation method for satellite tracking using a time synchronization technique vol.54, pp.8, 2014, https://doi.org/10.1016/j.asr.2014.06.013
  3. Study on the Preliminary Design of ARGO-M Operation System vol.27, pp.4, 2010, https://doi.org/10.5140/JASS.2010.27.4.393
  4. Design of tracking mount and controller for mobile satellite laser ranging system vol.49, pp.1, 2012, https://doi.org/10.1016/j.asr.2011.09.009
  5. Effect of the Application of the CBD Output Management Technique for the Development of Operation Software for a Space Observation System vol.31, pp.3, 2014, https://doi.org/10.5140/JASS.2014.31.3.265