Abstract
In this study, it was studied on arching characteristics of a grand section tunnel with pre-steel-rib nail reinforcement. In this study, we examine the adaptation of tunnel plan and the case which is based on the strengthening method for preexistence tunnel and other pre-steel-rib nail while the upper part of cover depth is low or soil condition is bad. When the pre-steel-rib nail as new technology and method reinforces the foundation placed of grand section tunnel, it is much better in strengthening effect, safety and effectiveness than the conventional one. After investigation about the plan pre-steel-rib nail method, construction case and calibration data, it was confirmed and examined about the upper part of tunnel for strengthening the pre-steel-rib nail thereby arching characteristics of grand section tunnel using MIDAS/GTS finite element program. Moreover we present the method that could upgrade the accurate installation interval and adaptation method for strengthening effect to adapt the pre-steel-rib nail method in a foundation placed over a tunnel.
본 연구에서는 상부 토피고가 낮거나 지반조건이 불량한 터널의 경우 기존 터널의 보강공법과 다른 선지보네일 보강공법을 적용한 터널의 설계 및 시공사례를 조사하였다. 신기술 신공법인 선지보네일 보강공법을 대단면 터널 상부지반에 보강하여 기존 터널 보강공법들에 비하여 보강효과 및 안정성 측면의 실효성을 확인하였다. 선지보네일 공법에 대한 설계, 현장시공 사례 및 계측 데이타를 조사하여 그 보강 결과를 확인하였으며, 터널 상부지반 선지보네일 보강에 따른 대단면 터널의 아칭 특성에 대하여 유한요소 수치해석 프로그램인 MIDAS/GTS를 이용하여 연구하였다. 이와 더불어 터널 상부지반에 선지보네일 공법을 적용함에 있어서 적절한 설치간격과, 적용시 공법의 보강효과를 극대화하기 위한 방법을 제시하였다.