Research on Using Six Sigma Tool to Reduce the Core Process Time

  • Chung, Yi-Chan (Department of Industrial Engineering and Management Ta-Hwa Institute of Technology) ;
  • Yen, Tieh-Min (Department of Industrial Engineering and Management Ta-Hwa Institute of Technology) ;
  • Hsu, Yau-Wen (Department of Industrial Engineering and Management Ta-Hwa Institute of Technology) ;
  • Tsai, Chih-Hung (Department of Industrial Engineering and Management Ta-Hwa Institute of Technology) ;
  • Chen, Ching-Piao (Department of Industrial Engineering and Management Ta-Hwa Institute of Technology)
  • Published : 2008.04.30

Abstract

When facing the global severe competition, the enterprises all try their best to upgrade the quality, reduce the costs to reach the goal of customer satisfaction. Motorola was the earliest firm creating the term Six Sigma (6 ${\sigma}$); GE was the enterprise successfully fulfilling Six Sigma. The success of these two firms revealed the prominent effects and became the world-class model enterprises. The main purpose of promoting Six Sigma activity was to reduce the possible defects in the business process to the least through designing and monitoring business process in order to reach the goals such as the best quality and efficiency, the lowest costs, the shortest circular process time, maximum profits and customer satisfaction. This research used the Six Sigma technique to improve the business process of ceramics manufacturing plant and find out the major factors of slower core task time by the analytical process of Process Mapping, Pareto Chart, Simu18 simulation software and figures and proposed the improvement measures. Through the confirmation of the case companies, it successfully reduced the core process time and the organizational costs and increased the capacity.

Keywords

References

  1. Blakeslee, J. A.(1999), "Achieving Quantum Leaps in Quality and Competitiveness: Implementing the Six Sigma Solution in Your Company," Quality Congress, pp. 486-497
  2. Eckes, G.(2002), "Making Six Sigma last: managing the balance between cultural and technical change," New York: John Wiley
  3. Hahn, G. J., Hill, W. J., Horel, R. W., and Zinkgraf, S. A.(1999), "The impact of Six Sigma improvement-A glimpse into the future of statistics," The American Statistician, Vol. 53, No. 3, pp. 208-215 https://doi.org/10.2307/2686099
  4. Lynch, D. P., Bertolino, S., and Cloutier, E.(2003), "How to Scope DMAIC Projects," Quality Progress, Vol. 36, No. 1, pp. 37-41
  5. Mach and Guagueta(2001), "Utilization of the Seven Ishikawa Tools (Old Tools) in the Six Sigma Strategy," 24th International Spring Seminar on Electronics Technology
  6. Mast, Jeroen De.(2003), "Quality Improvement from the Viewpoint of Statistical Method," Quality and Reliability Engineering International, Vol. 16, pp. 301-311 https://doi.org/10.1002/1099-1638(200007/08)16:4<301::AID-QRE340>3.0.CO;2-E
  7. Pande, P. S., Neuman, R. P., and Cavanagh, R. R.(2000), "The Six Sigma way: how GE, Motorola and other top companies are honing their performance," New York: McGrawHill
  8. Slater R.(2000), "The GE Way Field Book," McGraw Hill, New York
  9. Snee, R. D. and Hoerl, R. W.(2003), "Leading Six Sigma-A Step-by-Step Guide Based on Experience with GE and Other Six Sigma Companies," Prentice-Hall