Abstract

In the case of bi-directional high pressure pile load test with double-acting jack, the shortcomings of bi-directional pile load test with single-acting jack could be solved, low-cost of test could be sure, the limits of loading capacity could be overcome and quality assurance of service plie could be confirmed. In this study, to confirm the stability, the reliability and the application of bi-directional high pressure pile load test with double-acting jack, the calibration test for high pressure oil jacks, the length of high pressure hose and tunable high pressure pipe system were performed. As a result, credibility was very high because the reliability of test results was approached at about 1.0.

양방향 고유압 복동식 재하장치는 저유압 단동식 양방향 말뚝재하시험의 단점을 극복할 수 있을 뿐만 아니라 경제성을 확보할 수 있고 재하용량의 한계도 극복할 수 있는 장점이 있으며, 또한 사용말뚝의 품질안정성을 확보할 수 있다. 본 연구에서는 양방향 고유압 말뚝재하시험의 시험 시 안전성, 신뢰성 및 적용성을 확보하기 위하여 양방향 고유압 재하장치에 사용되는 고유압잭의 검 교정실험, 고유압호스의 길이에 대한 보정실험 및 동조식고압배관시스템의 보정실험을 실시하였으며 실험결과의 신뢰도($R^2$)는 1.0에 근접하고 있으므로 신뢰도는 매우 높은 것으로 판단되었다.

Keywords

References

  1. (주)지텍크(2006) 고압재하시스템을 이용한 양방향 선단 유압재하 장치를 통한 대구경 현장타설 철근 콘크리트 말뚝의 지지력 측정장치 및 측정방법, 특허등록번호 제10-0588761호
  2. (주)지텍크(2008) 해운대 우동 PROJECT 현장타설말뚝($\Phi$2,000, $\Phi$2,500) 및 소구경 현장타설말뚝($\Phi$500)의 재하시험, 대형평 판재하시험 및 품질시험 계획서
  3. Osterberg Jorj O. (1986) Device for Testing the Load Bearing Capacity of Concrete-filled Earthen Shafts. US-4614110