Investigation on the Credibility of the Vibrating Wire Strain Gauges used for the Tunnel Instrumentation

터널 진동현식 변형률 게이지의 신뢰성 시험 연구

  • Kim, Hak-Joon (Daejeon University, Dept. of Geotechnical Design Engineering) ;
  • Park, Chan (Korea Institute of Geoscience and Mineral Resources)
  • 김학준 (대전대학교 지반설계정보공학과) ;
  • 박찬 (한국지질자원연구원)
  • Published : 2008.06.30

Abstract

Vibrating-wire strain gauges are widely used for the tunnel instrumentation because of the long-term stability at humid environments. Domestic strain gauges are mainly used in Korea due to the high cost of the foreign strain gauges. The credibility of the domestic strain gauges is not properly proven even though strain gauges produced by many different companies are available in the markets. The purpose of this paper is to investigate the credibility of the 2.5" strain gauges by using a laboratory compression test.

진동현식 변형률 게이지는 습기가 많은 터널에서의 장기적 안정성이 우수하여 국내외 터널 현장에서 널리 사용되고 있다. 국내 터널 현장의 진동현식 게이지는 외국 제품도 일부 사용 되고 있으나 국내 게이지에 비하여 고가이어서 주로 국내에서 제작된 게이지가 이용되고 있다. 국산 진동현식 변형률 게이지는 상당히 많은 업체에서 제작되고 있으나 게이지의 신뢰상에 대해서는 검증이 제대로 이루어지지 못하고 있는 실정이다. 본 연구에서는 실내시험을 통하여, 국내 터널계측에 널리 사용되고 있는 2.5인치 진동현식 변형률 게이지에 대한 신뢰성을 검증하였다.

Keywords

References

  1. 남순성, 1999, 국내 터널 계측관리의 문제점 및 대책, 터널기술, 대한터널협회, pp. 98-103
  2. 한국구조물진단학회, 2006, 지하구조물 안전계측 이론과 실무, 구미서관, 446p
  3. 우종태, 이송, 2002, 터널 유지관리 계측의 실태 및 개 선방안, 한국구조물진단학회 논문집, V.6, No.3, pp.14-21
  4. Abramson, L. W. and Green, G. E., 1985, Reliability of strain gauges and load cells for geotechnical engineering applications, Reliability of Geotechnical Instrumentation, Transportation Research Record 1004, pp. 13-19
  5. Bordes, J. L. and Debreuille, P. J., 1985, Some facts about long-term reliability of vibrating wire instruments, Reliability of Geotechnical Instrumentation, Transportation Research Record 1004, pp. 20-26
  6. Choquet, R., Juneau, F., Debreuille, P. J., and Bessette, J., 1999, Reliability, long-term stability and gage performance of vibrating wire sensors with reference to case histories, International Symposium on Field Measurements in Geomechanics, pp. 49-54
  7. Dunnicliff, J., 1999. Systematic approach to planning monitoring programs using geotechnical instrumentation: An update, International Symposium on Field Measurements in Geomechanics, pp. 19-30
  8. McRae, J. B. and Simmonds, T., 1991, Long-term stability of vibrating-wire instruments: One manufacturer's perspective, International Symposium on Field Measurements in Geomechanics, Vol. 1, pp. 283-293