참고문헌
- EPRI, 2004, “Materials Reliability Program : Welding Residual and Operating Stresses in PWR Alloy 182 Butt Welds (MRP-106), EPRI Report
- Brust, F. W. and Scott, P. M., 2007, “Weld Residual Stresses and Primary Water Stress Corrosion Cracking in Bimetal Nuclear Pipe Welds,” Trans. of ASME PVP conference, PVP2007-26297
- Kim, J.S., Jin, T.E., Dong, P. and Prager, M., 2003, “Development of Residual Stress Analysis Procedure for Fitness-For-Service Assessment of Welded Structure,” Trans. of the KSME(A), Vol. 27, pp. 713-723 https://doi.org/10.3795/KSME-A.2003.27.5.713
- Brust, F. W. and Scott, P., 2007, “Primary Water Stress Corrosion Cracking (PWSCC) in Bimetal Nuclear,” Trans. of SMiRT 19 conference
- Fox, M., 1979, “An Overview of Intergranular Corrosion Cracking in BWRs,” Journal of materials in energy system, 1:3
- ASME, 2004, “Materials,” ASME Boiler and Pressure Vessel Code, Sec. II, Part D-properties
- Special Metals Corporation, 2007, “Inconel 600 Information,” www.specialmetals.com
- Brickstad, B. and Josefson, B. L., 1998, “A Parametric Study of Residual Stresses in Multi-pass Butt-welded Stainless Steel Pipes,” International Journal of Pressure Vessels and piping, Vol. 75, pp. 11-25 https://doi.org/10.1016/S0308-0161(97)00117-8
- ASME, 2004, “Welding and Brazing Qualification,” ASME Boiler and Pressure Vessel Code, Sec. IX
- British Energy Generation Ltd., 2001, “Assessment of the Integrity of Structures Containing Defects,” R6 Rivision 4
- ABAQUS, 2003, “ABAQUS Standard/User's Manual, Version 6.4,” Hibbit Karlsson & Sorensen, Inc
- Zaeem, M. A., Nami, M. R. and Kadivar, M. H., 2006, “Global Buckling Investigation in Welding of a Thin Wall Aluminum T Joint,” Trans. of ASME PVP conference, PVP2006-ICPVT-11-93106
- Mochizuki, M., Katsuyama, J. and Toyoda, M., 2006, “Effect of Geometric and Welding Conditions on Through-Thickness Residual Stress,” Trans. of ASME PVP conference, PVP2006-ICPVT-11-93489
- Limpus, C.R., Dijamco, D. Bax, G., Cofie, R. and Nathaniel G., 2007, “Effect of Size of Butt Weld Repaires on Weld Overlay Residual Stresses,” Trans. of ASME PVP conference, PVP2007-26636
- U.S. Nuclear Regulatory Commission, 1992, “Technical Report on Material Selection and Processing Guidelines for BWR Coolant Pressure Boundary Piping-Final Report,” NUREG-0313, Revision 2
- Dong, P.and Brust, F. W., 2000, “Welding Residual Stresses and Effects on Fracture in Pressure Vessel and Piping Components : A Millennium Review and Beyond,” Journal of Pressure Vessel Technology, Vol. 122, pp. 329-338 https://doi.org/10.1115/1.556189
- Warren, A. P., Bate, S. K. and Hurrell, P., 2007, “The Effect of Modeling Simplification on the Prediction of Residual Stresses in a Multi-pass Plate Groove Weld,” Trans. of ASME PVP conference, PVP2007-26339
- Rudland, D., Chen, Y., Zhang, T. and Wilkowski, G., 2007, “Comparison of Welding Residual Stress Solutions for Control Rod Drive Mechanism Nozzles,” Trans. of ASME PVP conference, PVP2007-26045
- Yaghi, A., Gyde, T. H., Becker, A. A., Sun, W. and Williams, J. A., 2006, “Residual Stress Simulation in Thin and Thick-walled Stainless Steel Pipe Welds Including Pipe Diameter Effects,” International Journal of Pressure Vessels and Piping, Vol. 83, pp. 864-874 https://doi.org/10.1016/j.ijpvp.2006.08.014
- Hurrell, P. R., Everett, D., Gregg, A. and Bate, S., 2006, “Review of Residual Stress Mitigation Methods for Application in Nuclear Power Plant,” Trans. of ASME PVP conference, PVP2006-ICPVT-11-93381
- Leggatt, N. A., Dennis, R. and Hurrel, P. R., 2007, “Modeling the Fabrication of a Pressure Vessel Toroidal Seal,” Trans. of ASME PVP conference, PVP2007-26145
- Dennis, R. J., Leggatt, N. A. and Gregg, A., 2006, “Optimisation of Weld Modeling Techniques – Bead on Plate Analysis, Trans. of ASME PVP conference, PVP2006-ICPVT-11-93907
- Bate, S. K., Warren, A. P., Watson, C. T., Hurrel, P. and Francis, J. A., 2007, “UK Research Programme on Residual Stresses – Progress to Date,” Trans. of ASME PVP conference, PVP2007-26337
피인용 문헌
- Effect of Normal Operating Condition Analysis Method for Weld Residual Stress of CRDM Nozzle in Reactor Pressure Vessel vol.37, pp.9, 2013, https://doi.org/10.3795/KSME-A.2013.37.9.1159
- Effects of Repair Weld of Reactor Pressure Vessel Upper Head Control Rod Drive Mechanism Penetration Nozzle on J-Groove Weldment Using Finite Element Analysis vol.38, pp.6, 2014, https://doi.org/10.3795/KSME-A.2014.38.6.637
- Evaluation of J-groove weld residual stress and crack growth rate of PWSCC in reactor pressure vessel closure head vol.29, pp.3, 2015, https://doi.org/10.1007/s12206-015-0236-5
- PWSCC initiation and propagation in a CRDM penetration nozzle vol.31, pp.11, 2017, https://doi.org/10.1007/s12206-017-1033-0
- Effects of Similar Metal Weld on Residual Stress in Dissimilar Metal Weld According to Safe End Length vol.33, pp.7, 2009, https://doi.org/10.3795/KSME-A.2009.33.7.664
- Investigation on the Effect of Strength Mismatch on Residual Stresses in Welds with Different Strength Used in Buried Natural Gas Pipeline vol.34, pp.4, 2010, https://doi.org/10.3795/KSME-A.2010.34.4.413
- Effects of Geometry of Reactor Pressure Vessel Upper Head Control Rod Drive Mechanism Penetration Nozzles on J-Groove Weld Residual Stress vol.35, pp.10, 2011, https://doi.org/10.3795/KSME-A.2011.35.10.1337
- Sensitivity Analysis of Finite Element Parameters for Estimating Residual Stress of J-Groove Weld in RPV CRDM Penetration Nozzle vol.36, pp.10, 2012, https://doi.org/10.3795/KSME-A.2012.36.10.1115
- Sensitivity Analysis of Nozzle Geometry Variables for Estimating Residual Stress in RPV CRDM Penetration Nozzle vol.37, pp.3, 2013, https://doi.org/10.3795/KSME-A.2013.37.3.387
- Finite element analysis and measurement for residual stress of dissimilar metal weld in pressurizer safety nozzle mockup vol.23, pp.11, 2009, https://doi.org/10.1007/s12206-009-0809-2