KTX-II development using systems engineering

신규고속철도차량(KTX-II)의 시스템엔지니어링 적용

  • Published : 2008.06.30

Abstract

As a supply contract for 100 new high-speed rolling stocks(KTX-II) was made 8th June 2006, System Engineering process has been applied to introduce the high-speed rolling stocks successfully and to manage the total life cycle systematically from Pre-concept Phase, Contract Phase, Preliminary and Critical Design Review, Production, Test and Verification, Acceptance and Operation to assurance for a flaw.