Crack Prevention of Very-Early Strength Latex-Modified Concrete

초속경 라텍스개질 콘크리트의 균열 억제방안

  • 이봉학 (강원대학교 토목공학과) ;
  • 최판길 (강원대학교 대학원 토목공학과)
  • Published : 2008.02.29

Abstract

An increase in the amount of cracking in repaired concrete bridge decks using VES-LMC(Very Early Strength - Latex Modified Concrete ; below VES-LMC) has been noticed by Yun et al(1). Literature indicates that indeed many concrete bridge decks develop transverse cracking, most developing at early ages(3~7 days), many right after construction. The purpose of this study was to establish prevention of map, transverse and longitudinal cracking in VES-LMC and to provide a control methods for minimizing the occurrence of cracks. The proposed prevention against map and transverse cracking was verified by field applications. VES cement was modified, the unit cement contents was reduced into $360kg/m^3$ from $390kg/m^3$, the maximum size of coarse aggregate was increase into 19mm from 13mm, wire mesh and steel fibers were incorporated in concrete mixture. A series of variable combinations were attempted. As a results, the proposed prevention against map and transverse cracking was verified because no crack were occurred until 90 days after overlay.

Keywords