The Effects of DO, HRT, and Media Packing Ratio on Nitrogen Removal Efficiency in BCM-ASR System

고정상 담체를 충전한 활성슬러지 공정에서 DO농도와 HRT 및 담체 충전율 변화가 질소 제거효율에 미치는 영향

  • Whang, Gye-Dae (Department of Environmental Engineering, Kyung Hee University) ;
  • Han, Bong-Seok (Department of Environmental Engineering, Kyung Hee University)
  • 황규대 (경희대학교 환경응용과학과) ;
  • 한봉석 (경희대학교 환경응용과학과)
  • Received : 2008.03.12
  • Accepted : 2008.10.14
  • Published : 2008.11.30

Abstract

Two sets of four parallel activated sludge reactors (ASRs) maintaining an MLSS of 3000 mg/L were operated to investigate the effect of DO, HRTs and bio-contact media (BCM) packing ratios on the removal efficiency of organic matters and nitrogen. Packing ratios of BCM to BCM-ASR systems 1, 2, 3, and 4 were 0% (suspended growth only), 10%, 15% and 20%, respectively. All systems were operated at an HRT of 4 hr, 6 hr, and 8 hr, respectively; DO concentration was maintained 0.5~1.0 mg/L and 1.5~2.0 mg/L for each HRT condition. In terms of TSS, TCODcr and SCODcr removal efficiency, all systems had a similar level of the removal efficiency under varied HRTs, and DO. But organic removal efficiency of systems with BCM was approximately 3~5% higher than systems without BCM at the same HRT and the DO. About the nitrification efficiency, with high DO (1.5~2.0 mg/L), as HRT (4 hr, 6 hr, 8 hr) or BCM packing ratio increased, the slight increment of nitrification efficiency was observed. However, under the low DO (0.5~1.0 mg/L), increase of BCM packing ratio and HRT resulted in large increase of the nitrification efficiency. At the same HRT and BCM packing ratio, the nitrification efficiency increased greatly with up to 15% as DO increased. When the HRT increased from 4hr to 8hr, the denitrification efficiency slightly increased by 5~10% only, under all DO conditions. Systems with BCM had higher denitrification efficiency, ranged 62.7~91.1% than systems without BCM showed 32.1~65.6%. And the increase in BCM packing ratio from 10% to 20% resulted in about 14~16% denitrification efficiency increment. BCM packing ratio showed great effect on the denitrification. The increase of the DO (from 0.5~1.0 mg/L to 1.5~2.0 mg/L) at the same HRT and BCM packing ratio resulted in slight decrease of denitrification efficiency with up to 7% for systems with BCM. But for systems without BCM, the denitrification efficiency decreased with up to 28%. In all system, the denitrification efficiency had more influence on the TN removal efficiency than nitrification efficiency. So, BCM packing ratio (0%, 10%, 15%, 20%) has greater effect on the TN removal than HRT and DO. The TN removal efficiency increased as packing ratio of BCM increased with up to 45%. As a result, the highest TN removal efficiency was observed 73.7% at the condition showed the highest denitrification efficiency that DO of 0.5~1.0 mg/L, an HRT of 8 hr, and 20% of BCM packing ratio was maintained.

Keywords

References

  1. 김선형, 박희등, 임성균, 최광호(1998). 폴리우레탄 담체를 이용한 합성 폐수 및 피혁 폐수의 생물학적 처리. 수질보전 한국물환경학회지, 14(3), pp. 251-258
  2. 류홍덕, 이상일(2005). 부유 및 부착성장 미생물을 이용하는 공정의 유기물, 질소 및 인 제거 특성 비교. 대한환경공학회지, 27(2), pp. 206-214
  3. 박종일, 이태진(2007). 단일 반응기를 이용한 동시 질산.탈질에 관한 연구. 대한환경공학회지, 29(2), pp. 220-228
  4. 박희등, 임봉수, 김현용(2003). 부유성 플라스틱 담체를 이용한 MLE공정의 하수고도처리 성능평가. 대한토목학회논문집, 23(5B), pp. 463-470
  5. 배성현(2006). 고정생물막을 이용한 $A_{2}O$공정에서 무산소조 체류시간 변화가 유기물질 질소 및 인 제거에 미치는 영향. 석사학위논문, 경희대학교
  6. 원종철, 남궁완, 배영신, 이경신, 박기혁, 송수성, 윤조희 (2000). MLE공정을 이용한 고농도 $NA_{4}^{+}$-N함유 침출수의 생물학적 질산화/탈질. 대한환경공학회지, 22(6), pp. 1027-1035
  7. 이수철, 이현용, 김동진(2000). 이중층 중공사 생물막 담체를 이용한 유동층 생물막 반응기에서의 동시 질산화와 탈질. 한국생물공학회지, 15(5), pp. 514-520
  8. 이태경, 박재구, 한기봉(2002). 세라믹 담체를 이용한 고정 생물막 공정에서의 동시 질산화 및 탈질화. 대한환경공학회지, 24(6), pp. 1105-1115
  9. 이해일, 임정훈, 고주형, 김창원(2003). 생물막 반응기를 이용한 고농도 유기성 폐수의 질산화와 탈질. 대한환경공학회지, 25(4), pp. 517-522
  10. APHA, AWWA, WEF (1995). Standard Methods for the Examination of Water and Wastewater, 21th ed. American Public Health Association, Washington, DC
  11. Bernet, N., Sanchez, O., Cesbron, D., Steyer, J. P., and Delgen., J. P. (2005). Modeling and control of nitrite accumulation in a nitrifying biofilm reactor. Biochemical Engineering Journal, 24, pp. 173-183 https://doi.org/10.1016/j.bej.2005.02.002
  12. Bishop, P. L., Zhang, T. C., and Fu, Y. C. (1995). Effects of biofilm structure, microbial distributions and mass transport on biodegradation processes. Wat. Sci. Tech., 31(1), pp. 143-152
  13. Levine, A. D., Tchobanoglous, G., and Asano, T. (1985). Characterization of the size distribution of contaminants in wastewater: treatment and reuse implications. J. Water Pollut. Control Fed., 57(7), pp. 805-816
  14. Marais, G. v. R. and Ekama, G. A. (1984). Biological nitrogen removal. In theory, Desigen and Operation of Nutrient Removal Activated Sludge Processes, 6.1-6.26, South African Water Research Commission, Pretoria
  15. Morper, M. R. (1994). Upgrading of activated sludge systems for nitrogen removal by application of the LINPOR-CN process. Wat. Sci. Tech., 29(12), pp. 167-176
  16. Pochana, K. and Keller, J. (1999). Study of factors affecting simultaneous nitrification and denitrification (SND). Water Sci. Technol., 39(6), pp. 61-68
  17. Rodgers, M. and Zhan, X. M. (2004). Biological nitrogen removal using a vertically moving biofilm system. Bioresource Technology, 93, pp. 313-319 https://doi.org/10.1016/j.biortech.2003.09.017
  18. Sen, P. and Dentel, S. K. (1998). Simultaneous nitrificationdenitrification in fluidized bed reactor. Wat. Sci. Tech., 38(1), pp. 247-254
  19. Third, K. A., Burnett, N., and Ralf, C. R. (2003). Simultaneous nitrification and denitrification using stored substrate (PHB) as the electron donor in an SBR. Biotech. and Bioengin., 83(6), pp. 706-720 https://doi.org/10.1002/bit.10708
  20. Third, K. A., Gibbs, B., Newland, M., and Cord-Ruwisch, R. (2005). Long-term aeration management for improved Nremoval via SND in a sequencng batch reactor. Water Research, 39, pp. 3523-3530 https://doi.org/10.1016/j.watres.2005.06.014
  21. Wang, X. J., Xia, S. Q., Chen, L., Zhao, J. F., Renault, N. J., and Chovelon, J. M. (2006). Nutrients removal from municipal wastewater by chemical precipitation in a moving bed biofilm reactor. Process Biochemistry, 41, pp. 824-828 https://doi.org/10.1016/j.procbio.2005.10.015
  22. Williamson, K. and McCarty, P. L. (1976). A model of substrate utilization by bacterial films. Journal WPCF., 48(1), pp. 9-24
  23. Zhang, T. C., Fu, Y. C., and Bishop, P. L. (1994). Competition in biofilms. Wat. Sci. Tech., 29(10-11), pp. 263-270
  24. Zhao, H. W., Mavinic, D. S., Oldham, W. K., and Koch, F. A. (1999). Controllong factors for simultaneous nitrification and denitrification in a two-stage intermittent aeration process treating domestic sewage. Water Res., 33(4), pp. 961-970 https://doi.org/10.1016/S0043-1354(98)00292-9