A Case Study on the Hybrid Reinforcement Retaining Wall System Reinforced by Soil Nail and Steel Strip

쏘일네일과 강재스트립으로 보강된 복합보강토옹벽 시스템의 사례연구

  • 천병식 (한양대학교 공과대학 토목공학과) ;
  • 김홍택 (한양대학교 공과대학 토목공학과) ;
  • 조현수 (두산건설 토목사업본부) ;
  • 도종남 (한양대학교 대학원 토목공학과)
  • Published : 2008.12.31

Abstract

The reinforced earth wall, which is able to improve the strength of soil highly, is required in case of supporting high surcharge load such as high speed rail way, high embankment road, and massive reinforced earth wall in a mountainous area. And also, it is continuously required that the method is able to minimize the amount of excavated soil on account of environmental issue, boundary of land, etc., on excavation site. However, because the required length of reinforcement should be $60{\sim}80%$ of the height of reinforced earth wall for general reinforced earth wall, in fact the reinforced earth wall is hardly applied on the site of cut slope. In this paper we studied the design and construction cases of hybrid reinforcement retaining wall system combined with steel strips and soil nails, connecting the reinforced earth wall reinforcements to the slope stability reinforcements (soil nails) to ensure sufficient resistance by means of reducing the length of reinforcements of reinforced earth wall. And the feasibility of hybrid reinforcement retaining wall system, suggested by real data measured on site, is also discussed.

지반의 지지력을 증가시키는 보강토공법은 일반적으로 산악지대에서 시행되는 건설공사에 쓰여지는데, 보강토 옹벽의 높이가 일반 평지의 성토구조물보다 상당히 높아지며, 성토도로의 시공이나 고속철도 등과 같은 높은 상재하중을 지지하여야 할 경우에는 지반강성을 크게 향상시킬 수 있는 공법의 적용이 요구된다. 또한, 절토공사 현장의 환경문제 및 대지경계 등의 이유로 원지반의 절취량을 최소화 할 수 있는 공법이 지속적으로 요구되고 있으며, 이를 만족하기 위한 많은 공법들이 개발되고 있는 실정이다. 그러나, 일반적인 보강토 옹벽의 경우 옹벽 높이의 $60{\sim}80%$정도에 해당되는 보강재 길이가 요구되어 절토현장에 적용하는데 어려움이 있다. 또한, 근래에 들어 용지경계 확보와 성토구조물의 안정성 확보 등 제한적인 범위에서 적용되던 보강토 옹벽공법이 추가 보강재를 병행, 사용함으로써 절토공사 현장에도 점차 적용되는 사례가 증가하고 있다. 본 연구에서는 보강토 옹벽의 보강재 길이를 줄이는 대선에 쏘일네일링 공법과 같은 사면보강공과 연결하여 충분한 저항력을 확보할 수 있도록 쏘일네일과 강재스트립으로 보강된 복합보 강토옹벽 시스템의 설계 및 시공사례를 소개하고 실제 현장에서 측정된 계측자료를 통해 복합보강토옹벽 시스템의 적용 가능성을 검토하였다.

Keywords

References

  1. 긴상규, 이응수 (1996), '화강토에서의 띠 보강재의 겉보기마찰 계수', 한국지반공학회지, 제12권 5호, pp.137-151
  2. 김홍택, 강인규, 성안제, 방윤경(1995), 'Nailed-Soil 굴착벽체의 발휘인장력 예측', 한국지반공학회지, 제11권, 제2호, pp. 70-97
  3. 김홍택, 김승욱, 전한용, 이인모 (1999), '황강풍화토 뒤채움흙 내부 토목섬유 복합보강재의 거동특성에 관한 기초연구', 한국지반공학회 논문집, 제15권 제5호, pp.171-191
  4. 김홍택, 방윤경, 조용권 (2002), '토목섬유의 온도 및 구속효과를 고려한 보강토 옹벽의 변위해석', 한국지반환경공학회 학술발표회 논문집, pp. 199-205
  5. 조삼덕, 김진만 (1995), '토목섬유 보강토구조물의 합리적인 해석과 설계', 한국건설기술연구원 연구보고서, 95-GE-1101
  6. 홍원표, 한중근, 김진오 (2001), '강그리드 보강재의 지지저항 산정', 대한토목학회논문집, 제21권 제3-C호, pp.225-231
  7. BSI (1995), 'BS8006 : 1995 - Code of Pructice for Strengthcned/ Reinforced Soils and Other Fills.', Brilish Standard Institution, London, UK., pp.127-212
  8. Elias. V. and Christopher. B. R. (1999), 'Mechanically Stabilized Earth Walls and Reinforced Soil Slopes Design and Construction Guidelines', FHWA Demonstration Project 82 Reinforced Soil Structures MSEW and RSS, Publication No. FHWA-SA-96-071. Federal Highway Administration. U.S. Department of Transportation, pp.213-325
  9. Elias. V., Christopher, B. R., and Berg. R. R. (2001), 'Mechanically Stabilized Earth Walls and reinforced Soil Slopes Design and Construction Guidelines', Publication No. FHWA-NHI-00-043, National Highway Institute, Federal Highway Administration. U.S. Department of Transportation
  10. Gassier. G. and Gudchus, G. ( 1983). 'Soil Nailing-StatiSlical Design'. Proceedings af 8th ECSMFE, Helsinki, Finland. Vol.2. pp.491-494
  11. GEO (2002), 'Guide to Reinforced Fill Structure and Slope Design', GEOGUIDE 6, Geotechnical Engineering Office. Hong Kong, pp. 124-213
  12. Guilloux, A. and Schlosser, F. (1982), 'Soil Nailing: Pructical Applications', Symposium on Recent Developments in Ground Improvement Techniques. Bankok, Thailand. pp.389-397
  13. Ingold. T. S. (1982), 'An Analylical Study of Geotcxtile Reinforced Embankments', proceedings of 2nd Interational Conference on Geotextiles, Industrial Fabric Association International. Las Vegas. pp.683-688
  14. Jewell, R. A. ( 1990), 'Revised Design Charts for Steep Reinforced Slopes', Proceedings of Symposium on Reinforced Embankments Theory and practice in British Isles. Cambridge, September, Thomas Telford. pp.1-27
  15. Leshchinsky, D. (1997a). 'ReSlope - A Software to Facilitate Design of Gcosynthetic-Reinforced Steep Slopes', Geotechnical Fabrics Report, January-February, 1997. pp.40-46
  16. Leshehinsky. D. (1997b), 'Design Procedure for Geosynthetie Reinforced Steep Slopes'. Technical Report REMR-GT-23. Prepared for Headquaners. U.S. Army Corps of Engineers Waterway Experiment Station, Washington, DC., pp.34-52
  17. Leshchinsky, D. and Bocdekcr. R. H. ( 1989). 'Geosynthetic Reinforced Soil Structures', Journal of Geotechnical Engineering. ASCE, Vol. 115, No.10. pp.1459-1478 https://doi.org/10.1061/(ASCE)0733-9410(1989)115:10(1459)
  18. NCMA (1997). 'Design Manual for Segmental Retaining Walls', Collin, J., Edilor, Second Edition, National Concrcte Masonry Association, Herndon, Virginia, USA
  19. Ruegger. R. (1986). 'Geotextilc Reinforced Soil Structures on which Vegetation Can Be Established', Procedding of the 3rd International Conference on Geotextiles, Vienna, Austria, pp.453-458
  20. Schlosser, F. (1982). 'Behaviour and Design of Soil Nailing', Symposium on Recent Develpmenmt in Ground Improvent Technieques, Bankok, Thailand. pp,399-413
  21. Schlosser, F. (1993), 'Recommendations Clouterre, 1991 (English Translation)', Federal Highway Administration, FHWA-SA-93-026
  22. Schmertmann. G. R., Chouery-Cunis. V. E., Johnson. R. D., and Bonapane. R. (1987). 'Design Charts for Geogrid-Rcinforced Soil Slopcs', Proceeding of Geosynthetics '87, New Orleans. U.S.A., pp.108-120
  23. Shen. C.K., Bang. S., and Herrmann. L.R (1981), 'Ground Movement Analysis of an Earth Support System'. Journal of the Geotechnical Engineering, ASCE. VoI.107. GT12., pp.512-374
  24. Stocker, M. F., Korber. G. W., Gassler. G. and Gudehus, G. (1979), 'Soil Nailing', C. R. Coll. Int Reinforcement Des Sois. Paris. pp. 469-474