Evaluating Service System Alternatives via a Computer Simulation-enabled MCDM Framework

  • Deng, Wei-Jaw (Graduate School of Business Administration Chung-Hua University) ;
  • Pei, Wen (Graduate School of Business Administration Chung-Hua University) ;
  • Tsai, Chih-Hung (Department of Industrial Engineering and Management Ta-Hwa Institute of Technology)
  • Published : 2007.08.30

Abstract

Decision makers in the service industry must effectively cope with queuing problems, service capacity optimization, service efficiency and service quality problems. This study proposes a computer simulation-enabled MCDM framework that integrates computer simulation analysis, Taguchi method, expert opinion and multiple criteria decision making (MCDM) to assist decision makers in coping with decision problems. In this framework, Taguchi method is adopted to reduce the time required for the simulation experiment. Computer simulation analysis is adopted to obtain useful information for rapid decision-making without interrupting actual production. MCDM is used to select the optimal alternative. The illustrative result is extremely promising.

Keywords

References

  1. Tsaur, S. H., Chang, T. Y., and Yen, C. H.(2002), The evaluation of airline service quality by fuzzy MCDM. Tourism Management, Vol. 23, pp. 107-115 https://doi.org/10.1016/S0261-5177(01)00050-4
  2. Saunders, C. E., Makens, P. K., and Leblanc, L. J.(1989), Modeling emergency department operations using advanced computer simulation systems. Annals of Emergency Medicine, Vol. 18, No.2, pp. 134-140 https://doi.org/10.1016/S0196-0644(89)80101-5
  3. Andreatta, G., Brunetta, L., and Righi, L.(2007), Evaluating terminal management performances using SLAM: The case of Athens International Airport. Computers & Operations Research, Vol. 34, pp. 1532-1550 https://doi.org/10.1016/j.cor.2005.07.024
  4. Chung, C. A. and Sodeinde, T.(2000), Simultaneous service approach for reducing air passenger queue time. Journal of Transportation Engineering, Vol. 126, No. 1, pp. 85-88 https://doi.org/10.1061/(ASCE)0733-947X(2000)126:1(85)
  5. Hwang, C. L. and Yoon, K.(1981), Multiple Attribute Decision Marking: Methods and Applications. Berlin: Springer
  6. Yoon, K. P. and Hwang, C. L.(1995), Multiple Attribute Decision Making: An Introduction. Thousand Oaks: Sage
  7. Zapf, M.(2004), From the customer to the firm: evaluating generic service process designs for incoming customer requests. Computers in Industry, Vol. 55, No. 1, pp. 53-71 https://doi.org/10.1016/j.compind.2003.10.009
  8. Sheu, C. McHaney, R., and Babbar, S.(2003), Service process design flexibility and customer waiting time. International Journal of Operations and Production Management, Vol. 23, No.8, pp. 901-917 https://doi.org/10.1108/01443570310486347
  9. Juran, D. C. and Schruben, L. W.(2004), Using worker personality and demographic information to improve system performance prediction. Journal of Operations Management, Vol. 22, pp. 355-367 https://doi.org/10.1016/j.jom.2004.05.003
  10. Kharwat, A. K.(1991), Computer simulation: an important tool in the fast-food industry. Proceeding of the 1991 Winter Simulation Conference, pp. 811-815
  11. Klassen, K. J. and Rohleder, T. R.(1996), Scheduling outpatient appointments in a dynamic environment. Journal of Operations Management, Vol. 14, pp. 83-101 https://doi.org/10.1016/0272-6963(95)00044-5
  12. Ohboshi, N., Masui, H., and Kambayashi, Y. A.(1998), study of medical emergency workflow. Computer Methods and Programs in Biomedicine, Vol. 55, No.3, pp. 177-190 https://doi.org/10.1016/S0169-2607(97)00063-1
  13. Pagell, M. and Melnyk, S. A.(2004), Assessing the impact of alternative manufacturing layouts in a service setting. Journal of Operations Management, Vol. 22, No.4, pp. 413-429 https://doi.org/10.1016/j.jom.2004.05.005
  14. Sheu, C. and Babbar, S. A(1996), managerial assessment of the waiting time performance for alternative service process designs. Omega, Vol. 24, No.6, pp. 689-703 https://doi.org/10.1016/S0305-0483(96)00035-7
  15. Kim, H. W. and Kim, Y. G.(2001), Rationalizing the customer service process. Business Process Management Journal, Vol. 7, No.2, pp. 139-156 https://doi.org/10.1108/14637150110389713
  16. Lam, K. and Lau, R. S. M. A.(2004), simulation approach to restructuring call centers. Business Process Management Journal, Vol. 10, No.4, pp. 481-494 https://doi.org/10.1108/14637150410548119
  17. Swisher, J. R., Jacobson, S. H., Jun, J. B., and Balci, O.(2001), Modeling and analyzing a physician clinic environment using discrete-event (visual) simulation. Computers & Operations Research, Vol. 28, pp. 105-125 https://doi.org/10.1016/S0305-0548(99)00093-3
  18. Zhao, X., Lau, R. S. M., and Lam, K.(2002), Optimizing the service configuration with the least total cost approach. International Journal of Service Industry Management, Vol. 13, No.4, pp. 348-361 https://doi.org/10.1108/09564230210445050
  19. Chen, J. C. and Kuo, M. H.(2000), Effects of different types of leadership on the adaptability of subordinates. Journal of the Chinese Institute of Industrial Engineers, Vol. 17, No.4, pp. 377-391 https://doi.org/10.1080/10170669.2000.10432886
  20. Chan, P. C., Yung, H. K., Lam, T. I., Tam, C. M., and Cheung, S. O.(2001), Application of Delphi method in selection of procurement systems for construction projects. Construction Management and Economics, Vol. 19, pp. 699-718 https://doi.org/10.1080/01446190110066128
  21. Lin, C. K. Y., Lai, K. F., and Hung, S. L.(2000), Development of a workforce management system for a customer hotline service. Computers & Operations Research, Vol. 27, pp. 987-1004 https://doi.org/10.1016/S0305-0548(99)00072-6
  22. Kelton, W. D., Sadowski, R. P., and Sadowski, D. A.(1998), Simulation with ARENA. Boston: McGraw-Hill
  23. Law, A. M., and Kelton, W. D.(2002), Simulation Modeling and Analysis. New York: McGraw-Hill
  24. Proctor, T.(1996), Simulation in hospitals. Health Manpower Management, Vol. 22, No. 5, pp. 40-44 https://doi.org/10.1108/09552069610129708
  25. Chen J. J. and Hsiao C. A.(2001), Using the Taguchi paradigm in simulation experiment for optimum lunch-box manufacturing system design. Tunghai Journal, Taiwan, Vol. 42, pp. 63-72
  26. Roy, R. K.(2001), Design of Experiments Using the Taguchi Approach: 16 Steps to Product and Process Improvement. New York: John Wiley & Sons
  27. Opricovic, S. and Tzeng, G. H.(2004), Compromise solution by MCDM methods: a comparative analysis of VIKOR and TOPSIS. European Journal of Operational Research, Vol. 156, pp. 445-455 https://doi.org/10.1016/S0377-2217(03)00020-1
  28. Tong, L. I., Wang, C. H., Chen, C. C., and Chen, C. T.(2004), Dynamic multiple responses by ideal solution analysis. European Journal of Operational Research, Vol. 156, pp. 433-444 https://doi.org/10.1016/S0377-2217(03)00017-1
  29. Rockwell Software Inc. Arena User's Guide Version 6.0. West Allis: Rockwell Software Inc; 2002