A Study on Evaluation and Improvement of Production Process Using Arena and Six Sigma in Small and Medium Enterprise

Arena와 Six Sigma를 이용한 중소기업의 공정평가 및 개선을 위한 연구

  • Lim, Seok-Jin (Department of Industrial System Engineering, Induk Institute of Technology) ;
  • Park, Song-E (Department of Industrial System Engineering, Induk Institute of Technology) ;
  • Lee, Woo-Neung (Department of Industrial System Engineering, Induk Institute of Technology)
  • 임석진 (인덕대학 산업시스템경영과) ;
  • 박송이 (인덕대학 산업시스템경영과) ;
  • 이우능 (인덕대학 산업시스템경영과)
  • Published : 2007.12.30

Abstract

This study deals with the improvement of production process on a flow production system with the consideration of six sigma. We analyze the production process and survey the important factors of improvement of productivity. Using a six sigma, we find strategic point and suggest a reformation of production process. We applied a simulation technique to simulate the production line proposed by the result of the Six sigma. With the result of the simulation, this study analyzes the propriety of production line and proposes the alternatives of new production process.

Keywords

References

  1. 문일경, 윤원영, 조규갑, 최원준, 'Arena를 이용한 시뮬레이션', 교보문고, 2002
  2. 조규갑, 김갑환, 이영해, 윤원영,, '생산시스템 시뮬레이션', 창현출판사, 1994
  3. 엄석진, '흐름생산방식에서의 라인균형을 통한 생산성 향상', 고려대학교 석사학위논문, 고려대학교, 1997. 8
  4. Chakravarty, A. K. and A. Shtub., Balancing Mixed Model Lines With In-Process Inventory, Management Science, Vol.31, No.9, pp.1161-1174, 1985 https://doi.org/10.1287/mnsc.31.9.1161
  5. Dessouky. M. M., Adiga. S., Park. K., Design and scheduling of flexible assembly lines for printed circuit boards, Int. J. Prod. Res, Vol.33, No.3, pp.757-775, 1995 https://doi.org/10.1080/00207549508930178