참고문헌
- Arthur, J.L. and K.D. Lawrence, 'A Multiple Goal Blending Problem,' Computers and Operations Research, Vol.7(1980), pp.215-224 https://doi.org/10.1016/0305-0548(80)90007-6
- Belvaux, G. and L.A. Wolsey, 'Modelling Practical Lot-Sizing Problems as Mixed- Integer Programs,' Management Science, No.47(2001), pp.993-1007
- Blazewicz, J. and M. Y. Kovalyov, 'The Complexity of Two Group Scheduling Problems,' Journal of Scheduling, Vol. 5(2002), pp.477-485 https://doi.org/10.1002/jos.118
- Candler, W., 'Coal Blending with Acceptance Sampling,' Computers and Operations research, Vol.18(1991), pp.591-596 https://doi.org/10.1016/0305-0548(91)90066-Z
- Candler, W., 'An Integrating Model for the Acquisition and Use of Metallurgical Coals in Steel Works,' Ph.D Thesis, 1995, Lancaster Univesity, Brazil
- Cheng, T.C.E. and Z.L. Chen, 'Parallel Machine Scheduling with Batch Setup Times,' Operations Research, Vol.42(1994), pp.1171-1174 https://doi.org/10.1287/opre.42.6.1171
- Dorsey, R.C., T.J. Hodgson, and H.D. Ratliff, 'A Production-Scheduling Problem with Batch Processing,' Operations Research, Vol.22(1974), pp.1271-1279 https://doi.org/10.1287/opre.22.6.1271
- Garver, L.L., 'Power Scheduling by Integer Programming,' IEEE Transactions on Power Apparatus and Systems, Vol. 81(1963), pp.730-735
- Gopalakrishnan, M., 'A Modified Framework for Modeling Set-up Carryover in the Capacitated Lotsizing Problem,' International Journal of Production Research, Vol.38(2000), pp.3421-3424 https://doi.org/10.1080/002075400418324
- Glismann, K. and G. Gruhn, 'Short-term Scheduling and Recipe Optimization of Blending Processes,' Computer and Chemical Engineering, Vol.25(2001), pp.627-634 https://doi.org/10.1016/S0098-1354(01)00643-3
- Gupta, D. and T. Magnusson, 'The Capacitated Lot-sizing and Scheduling Problem with Sequence-dependent Setup Costs and Setup Times,' Computers and Operations Research, Vol.32(2005), pp.727-747 https://doi.org/10.1016/j.cor.2003.08.014
- McColl, W.H.S., 'Management and Operations in an Oil Company,' Operations Research Quarterly, Vol.20(1969), pp.64-65
- Orcun, S., I. K. Altinel, and O. Hortacsu, 'General Continuous Time Models for Production Planning and Scheduling of Batch Processing Plants : Mixed Integer Linear Program Formulations and Computational Issues,' Computer and Chemical Engineering, Vol.25(2001), pp.371-389 https://doi.org/10.1016/S0098-1354(00)00663-3
- Stigler, G., 'The Cost of Subsistence,' Journal of Farm Economics, Vol.27(1945), pp.303-314 https://doi.org/10.2307/1231810
- Suerie, C. and H. Stadtler, 'The Capacitated Lot-Sizing Problem with Linked Lot Sizes,' Management Science, Vol.49(2003), pp.1039-1054 https://doi.org/10.1287/mnsc.49.8.1039.16406
- Sutton, D.W. and P.A. Coates, 'On-Line Mixture Calculation System for Stainless Steel Production by BSC Stainless : the Least Through Cost Mix System,' Journal of the Operational Research Society, Vol. 32(1981), pp.165-169 https://doi.org/10.1057/jors.1981.39