과제정보
연구 과제 주관 기관 : 부산대학교
참고문헌
- 남궁은, 2001년도 주요정책추진방향, 제9회 세계 물의 날 기념 '먹는 물과 건강' 세미나집, 국립환경연구원 (2001)
- 박수완, 전환돈, 김정욱, 상수도 주철 배수관로의 파손자료 유형에 따른 판손율 모형화와 수정된 시간척도를 이용한 최적 교체시기의 산정, 한국수자원학회논문집, 40(1), pp. 39-50 (2007) https://doi.org/10.3741/JKWRA.2007.40.1.039
- American Society of Civil Engineers (ASCE), Creating the 21st century through innovation, American Society of Civil Engineers, Civil Engineering Research Foundation, Report #96-5016.E (1996)
- American Water Works Association (AWWA), Dawn of the Replacement Era: Reinvesting in Drinking Water Infrastructure, Water Industry Technical Action Fund, Denver, CO, pp. 17-18 (2001)
- Burn, L. S., Tucker, S. N., Rahilly, M., Davis, P., Jarrett, R. and Po, M., Asset planning for water reticulation systemsthe PARMS model, Water science & technology: Water Supply, 3, pp. 55-62 (2003)
- Deb, A. K., Herz, R. K., Hasit, Y. J. and Grablutz, F. M., Quantifying future rehabilitation and replacement needs of water mains, AWWA Research Foundation, Denver (1998)
- Kleiner, Y. and Rajani, B., Comprehensive review of structural deterioration of water mains: statistical models, Urban Water, 3, pp. 131-150 (2001) https://doi.org/10.1016/S1462-0758(01)00033-4
- Malandain J., Le Gauffre P., Miramond M., Organizing A. Decision Support System For Infrastructure Maintenance: Application To Water Supply Systems, Proceedings of the First International Conference on New Information Technologies for Decision-making in Civil Engineering, Montreal, Canada, pp. 1013-1024 (1998)
- Office of Management and Budget, OMB Circular No. A-94, U.S. Executive Office of the President (1992)
- Park, S. and Loganathan, G. V., Optimal Pipe Replacement Analysis with a New Pipe Break Prediction Model, Journal of the Korean Society of Water and Wastewater, 16(6), pp. 710-716 (2002)
- Rajani, B. and Kleiner, Y., Comprehensive Review of Structural Deterioration of Water Mains: Physically based Models, Urban Water, 3, pp. 151-164 (2001) https://doi.org/10.1016/S1462-0758(01)00032-2
- Shamir, U. and Howard, C. D. D., An analytic approach to scheduling pipe replacement, Journal of American Water Works Association, 71(5), pp. 248-258 (1979) https://doi.org/10.1002/j.1551-8833.1979.tb04345.x
- UtilNets, Reliability-Based Decision Support System for the Maintenance Management of the Underground Network of Utilities, Final Technical Report, Computer Technology Institute (1997)