참고문헌
- Arisha, A. and Young, P. (2004), Intelligent Simulation-based Lot Scheduling of Photolithography Toolsets in a Wafer Fabrication Facility, Proceedings of the 2004 Winter Simulation Conference, 2,1935-1942
- Bae, D. S., Lee, N. Y., Kwon, H. M., Jang, J. S., Cha, M. S., Yoon, W. Y., Kim, M. S., and Lee, M. G. (2004), Theory of Statistics and Application, Chung-moon-gak, Seoul, Korea
- Choi, B. K. (2004), Samsung Electro-Mechanics MES ISP Report
- Hsieh, B. W., Chen, C. H., and Chang, S. C. (2001), Scheduling Semiconductor Wafer Fabrication by Using Ordinal Optimization-Based Simulation, IEEE Transactions on Robotics and Automation, 17(5), 599-608 https://doi.org/10.1109/70.964661
- Jeong, I. J. and Lee, Y. S. (2005), A Case Study of the Development of Standard Production Information System in TFT-LCD Factory, Journal of the Society of Korea Industrial and Systems Engineering, 28(1), 41-48
- Kim, K. Y., Lee, J. H., Kang, C. H., and Kim, K. H. (2005), A Simulation Study for Analyzing an on-Demand Semiconductor Wafer Process, IE Interfaces, 18(1), 22-34, March 2005
- Lee, Y. H., Cho, H. M., Park, J. K., Lee, B. K. (1999), Scheduling Simulator for Semiconductor Fabrication Line, IE Interfaces, 12(2),437-447
- Potoradi, J., Boon, O. S., Mason, S. J., and Fowler, J. W. (2002), U sing Simulation-based Scheduling to Maximize Demand Fulfillment in a Semiconductor Assembly Facility, Proceedings of the 2002 Winter Simulation Conference, 2,1857-1861
- Shikalgar, S. T., Fronckowiak, D., and MacNair, E. A. (2002), 300mm Wafer Fabrication Line Simulation Model, Proceedings of the 2002 Winter Simulation Conference, 2, 1365-1368
- Upasani, A. A., Uzsoy R., and S ouriraj an, K. (2006), A Problem Reduction Approach for Scheduling Semiconductor Wafer Fabrication Facilities, IEEE Transactions on Semiconductor Manufacturing, 19(2), 216-225 https://doi.org/10.1109/TSM.2006.873510