Abstract
This study presents a framework for optimum scale determination for small hydropower development in a river basin. The framework includes the construction of hydrology and topography data, the simulation of hydropower operation, the economic analysis, and the determination of optimum scale of the small hydropower. The optimum scale of design flow and facility are determined by Net Present Value among economic analysis indices. The investment cost is estimated by the cost function derived from the construction cost of existing small hydropower plants. The benefit from power generation is estimated by the price announced by government. The presented framework is applied to the two potential sites in Cho River basin for the dam and run-of-river type of plants. Finally, the sensitivity analysis for a design flow and scale of the plant is performed for the each site. The usage of the framework presented in the study is highly expected for the estimation of potential hydropower resources or the decision support tool for a proprietor by estimating the optimum scale and economical feasibility in advance.
본 연구에서는 하천유역에서 소수력 개발 대상지점에서의 최적규모를 결정하는 방안을 제시하였다. 제시된 방안은 지형 및 수문자료의 구축, 발전소 모의운영, 경제성분석, 최적규모 결정과 같은 일련의 절차로 이루어진다. 최적규모 결정을 위해 경제성 평가지표 가운데 하나인 순현가를 이용하였고, 이를 통해 최적 설계유량과 시설물의 최적규모를 도출하였다. 초기비용의 산출을 위하여 기존 소수력발전소의 비용 자료를 검토하여 함수식을 개발하였고, 편익 산정시 현재 공시된 전력 기준단가를 이용하였다. 이러한 일련의 절차를 기존에 조사된 금강수계의 초강유역에 위치한 댐식, 수로식 소수력 지점 2개소에 적용하였으며, 최종적으로 설계유량과 시설물의 규모 변화에 따른 NPV 민감도를 확인하여 최적규모를 결정하였다. 본 연구에서 제시한 방법은 소수력 개발지점에서의 최적규모 및 경제성 여부를 사업추진 이전에 개략 추정하여 잠재수력 부존량을 확인함으로써 사업시행주체의 의사결정 지원 측면에서 활용도가 높을 것으로 기대된다.