DOI QR코드

DOI QR Code

조선소 옥외 물류의 이산 사건 시뮬레이션에 관한 연구

A Study on Discrete Event Simulation of Shipyard Outdoor Block Movement

  • 이춘재 (서울대학교 해양시스템연구소) ;
  • 이장현 (인하대학교 공과대학 선박해양공학과) ;
  • 우종훈 (서울대학교 해양시스템연구소) ;
  • 신종계 (서울대학교 공과대학 조선해양공학과) ;
  • 유철호 (인하대학교 공과대학 선박해양공학과)
  • Lee, Choon-Jae (Research Institute of Marine System Engineering, Seoul National University) ;
  • Lee, Jang-Hyun (Department of Naval Architecture and Ocean Engineering, Inha University) ;
  • Woo, Jong-Hun (Research Institute of Marine System Engineering, Seoul National University) ;
  • Shin, Jong-Gye (Department of Naval Architecture and Ocean Engineering, Seoul National University) ;
  • Ryu, Cheol-Ho (Department of Naval Architecture and Ocean Engineering, Inha University)
  • 발행 : 2007.12.20

초록

Simulation model of outdoor block movement of shipyard is implemented in this paper. The load of the outdoor workshops in a shipyard influences a mid-term planning and scheduling of the shipyard. Since the load analysis is expected in advance before confirming the planning and scheduling, a discrete event simulation (DES) may be a good solution. The accuracy of DES is up to the accurate modeling of Products, Processes, and Resources (PPR) included in a system. PPR in the outdoor system are clearly defined and the simulation model for the outdoor logistics is implemented by modeling the selective PPR with the help of a DES tool which is programmable by users. The simulation model is verified by comparing the results with the real shipyard data. The outputs through the simulation are discussed.

키워드

참고문헌

  1. 우종훈, 이광국, 정호림, 권영대, 신종계, 2005, '디지털 생산 시뮬레이션 기반의 판넬라인 일정계획지원 시스템 구축,' 대한조선학회 논문집, 제42권, 제2호, pp. 165-174
  2. 이광국, 강현진, 김세환, 박주용, 신종계, 2005, '조선 소조립 용접로봇토치 변경에 따른 디지털 생산 기반 생산성 향상방안 평가,' 한국 CAD/CAM 학회 논문집, 제10권, 제3호, pp.210-216.
  3. 이광국, 최동한, 한상동, 박주용, 신종계, 2006, '디지털 생산 시뮬레이션 기반의 판넬라인 일정계획지원 시스템 구축,' 대한조선학회 논문집, 제43권, 제2호, pp. 228-235 https://doi.org/10.3744/SNAK.2006.43.2.228
  4. 신종계, 2005, 고부가가치 선박 개발용 디지털 통합 건조공법 개발, 사업 최종보고서, 산업자원부
  5. Bair, F., Langer, Y., Caprace, J., and Rigo, P., 2005, 'Modeling, Simulation, and Optimization of a Shipbuilding Workshop,' The 4th International Conference on Computer Applications and Information Technology in the Maritime Industries(COMPIT'05), pp. 283-293
  6. Banks, J., Carson J.S., Nelson, B.L., and Nichol , D.M., 2001, 'Discrete-Event System Simulation 3rd Edition,' Prentice-Hall International Series in Industrial and Systems Engineering, Upper Saddle River, New Jersey 07458
  7. Chung, C.A., 2004, Simulation Modeling Handbook – A Practical Approach, CRC Press
  8. Kaarsemaker, J. and Nienhuis, U., 2006, 'Simulation of a Maritime Pre-fabrication Process,' The 5th International Conference on Computer Applications and Information Technology in the Maritime Industries (COMPIT'06)
  9. Nedess, C., Friedewald, A., Wagner, L., and Hubler M., 2006, 'Simulation of Material Flow Processes in the Planning of Production Spaces in Shipbuilding,' The 5th International Conference on Computer Applications and Information Technology in the Maritime Industries (COMPIT'06)
  10. Krause M., Roland F., Steinhauer D., and Heinemann M., 2004, 'Discrete Event Simulation: An Efficient Tool to Assist Shipyard Investment and Production Planning,' Journal of Ship Production, Vol. 20, No. 3, pp. 176–182
  11. Steinhauer, D., 2003, 'The Virtual Shipyard – Simulation in Production and Logistics at Flensburger,' 2nd COMPIT, pp. 203-209
  12. Steinhauer, D., 2005, 'SAPP – Simulation Aided Production Planning at Flensburger,' Proceedings of COMPIT, pp. 391-398
  13. Steinhauer, D. and Meyer-Konig, S., 2006, 'Simulation Aided Production Planning in Block Assembly,' The 5th International Conference on Computer Applications and Information Technology in the Maritime Industries (COMPIT'06)

피인용 문헌

  1. Discrete Event Simulation for the Initial Capacity Estimation of Shipyard Based on the Master Production Schedule vol.17, pp.2, 2012, https://doi.org/10.7315/CADCAM.2012.111
  2. A Study on Simulation based Manufacturing in Shipyards : Focused on a Long-term Plan Verification vol.20, pp.1, 2014, https://doi.org/10.7837/kosomes.2014.20.1.086